GB
Page 15 / 96
NCE. Rev. 3 - Operating Instructions
5.1 Handling
Handle with care, the packages must not receive impacts.
Avoid to impact onto the package materials that could damage the pump.
6 INSTALLATION
6.1 Dimensions
For the dimensions of the device refer to the annex "Dimensions" (paragraph 12.1
Annexes).
6.2 Ambient requirements and installation site dimensions
The customer has to prepare the installation site in order to guarantee the right
installation and in order to fulfill the device requirements (electrical supply, etc...).
The place where the device will be installed must fulfill the requirements in the
paragraph 3.2.
It's Absolutely forbidden to install the machine in an environment with potentially
explosive atmosphere.
6.3 Unpacking
Inspect the device in order to check any damages which may have
occurred during transportation.
Package material, once removed, must be discarded/recycled according to
local laws of the destination country.
6.4. Installing the pump
Ensure the inside of pipes are clean before connection.
Mount pump in an easily accessible position.
To avoid draining and refilling of the whole pipe system when dismantling the
pump, it is recommended to provide gate valves on the suction and delivery sides.
The pump must be installed with the shaft axis horizontal (
cap. “12.2
fig. 1).
In order to obtain a correct terminal box position, the motor housing must be
turned once the screws have been loosened (
cap. “12.2
fig. 2). Change the
terminal box positions as shown (
cap. “12.2
fig. 3).
ATTENTION: Take care not to damage the casing gasket. The pipes
connected to the pump should be secured to rest clamps so that they do not
transmit stress, strain or vibrations to the pump.
The arrow on the pump casing indicates the direction of water flow (
cap. “12.2
fig. 4).
6.4.1. Insulating the pump
The loss of heat from the pump can be limited using thermo-insulating shells
(standard supplied with model NCE EA). Shells for the other pumps can be ordered
separately.
6.5 Electrical connection
Electrical connection must be carried out only by a qualified electrician in
accordance with local regulations.
Follow all safety standards.
OFF
i
OFF
Содержание NCE EA Series
Страница 68: ...GR 68 96 NCE Rev 3 3 2 40 C 4 4 1 CALPEDA S p A 4 2 4 3 4 4 4 5 5 i i...
Страница 69: ...GR 69 96 NCE Rev 3 5 1 6 6 1 12 1 6 2 3 2 6 3 6 4 12 2 1 12 2 2 12 2 3 2 1 6 4 1 E NCE EA 6 5 L i OFF...
Страница 72: ...GR 72 96 NCE Rev 3 8 CALPEDA SpA CALPEDA SpA 8 1 LED MAX LED 9 i OFF i OFF...
Страница 73: ...GR 73 96 NCE Rev 3 10 10 1 CALPEDA S p A 11 OFF 1 2 3 LED LED LED LED LED LED LED 7 4 7 5...
Страница 77: ...RU C 77 96 NCE Rev 3 3 2 40 4 4 1 Calpeda S p A 4 2 4 3 4 4 4 5 5 i...
Страница 78: ...RU C 78 96 NCE Rev 3 5 1 6 6 1 12 1 6 2 3 2 6 3 6 4 12 2 1 12 2 2 12 2 3 12 2 4 4 1 NCE EA 6 5 i OFF OFF...
Страница 79: ...RU C 79 96 NCE Rev 3 II 5 1 2 N L 3 4 3 7 7 1 7 2 50 C 7 3 NCE EA 7 4 11 7 4 MAX OFF...
Страница 81: ...RU C 81 96 NCE Rev 3 8 Calpeda S p A Calpeda S p A 8 1 MAX 9 i OFF OFF i...
Страница 86: ...86 96 NCE Rev 3 4 2 4 3 4 4 4 5 5 5 1 6 6 1 12 1 6 2 3 2 6 3 6 4 12 2 1 12 2 2 12 2 3 12 2 4 i...
Страница 87: ...87 96 NCE Rev 3 6 4 1 NCE EA 6 5 12 2 5 1 2 N L 3 4 3 7 7 1 7 2 50 C 7 3 LED LED NCE EA 7 4 22 OFF OFF...
Страница 89: ...89 96 NCE Rev 3 7 6 6 5 8 CALPEDA CALPEDA S P A 8 1 LED MAX LED 9 i i OFF OFF ON...
Страница 90: ...90 96 NCE Rev 3 1 2 3 LED LED LED LED LED LED 7 4 7 5 10 10 1 CALPEDA S P A 11 OFF...
Страница 94: ...94 96 NCE Rev 3 12 6 2 3 1 4 3 9 Fig 1 Fig 2 Fig 3 Fig 4 Fig 5...