2
A.
INITIAL INSPECTION
1.
Upon receipt from the carrier, inspect the heater for
possible damage in transit. If necessary, immediately
report damage to shipping company.
2.
Verify that the nameplate voltage, phase, and wattage
are as ordered and are suitable for use on the electrical
power supply available. DO NOT CONNECT THE BX
CONVECTION HEATER TO AN ELECTRICAL SUPPLY
VOLTAGE OTHER THAN THAT SHOWN ON THE
PRODUCT NAMEPLATE.
3.
The BX convection heater is CSA approved for operation
in non-hazardous areas only. Ensure that no hazardous
conditions exist before energizing the heater.
TABLE OF CONTENTS
A. Initial Inspection
2
B. Installation
3
C. Electrical Connections
4
D. Temperature Control
5
E. Maintenance
5
F. Replacement Parts
6
G. Elements
6
Содержание BX2011S
Страница 7: ...NOTES ...