REGULAR PLANNED MAINTENANCE
Operations to be carried out during a regular planned maintenance visit
are as follows:
1. Replace all belts where fitted.
2. Clean or replace filters as applicable. (This action may be required
more frequently than regular servicing.
3. Check operation and condition of all fans and compressors.
4. Check capacitor tolerances (where fitted).
5. Check condition of all heat exchangers/evaporators.
6. Check refrigeration system parameters.
7. Check operation of control valves.
8. Check for water leaks.
9. Check drip trays and internal drain lines for blockages and clear.
10. Check operation of controls and calibrate as necessary.
11. Check operation of interlocks in use.
12. Final check on overall operation of unit.
13. Indicate on report any faults found or causes for concern.
14. Frequencies recommended:
Light to medium use
2 visits per year.
Heavy use
4 visits per year.
26
SD566250 ISSUE 35
PR0-PAC SYSTEM OWNER INSTALLATION MANUAL
Содержание Pro-Pac 140
Страница 1: ...Pro Pac system Pro Pac 30 45 70 90 140HC Owner installation manual SD566250 issue 35...
Страница 2: ...2 SD566250 ISSUE 35 PR0 PAC SYSTEM OWNER INSTALLATION MANUAL...
Страница 50: ...50 SD566250 ISSUE 35 PR0 PAC SYSTEM OWNER INSTALLATION MANUAL...
Страница 51: ...51 SD566250 ISSUE 35...
Страница 54: ...2 SD566250 ISSUE 35 SYSTEME PRO PAC MANUEL D INSTALLATION...
Страница 102: ...50 SD566250 ISSUE 35 SYSTEME PRO PAC MANUEL D INSTALLATION...
Страница 103: ...51 SD566250 ISSUE 35...