
INSTALLATION
Model No.: CV-610 Seated Pull down
Caloo Ltd
www.caloo.co.uk | [email protected]
A: Pylon Foundation Bolts
1. Make the concrete block according to above drawings
2. Embed 4 foundation bolts into the concrete block.
3. Wait for the concrete block to cure completely. Recommended curing time: 48 hours.
A: Pylon Expansion Bolts
1. Make sure the concrete surface is clean and flat.
2. Drill 4 expansion bolt holes with a concrete hammer accoring to above drawing.
3. Use a hammer to mount the expansion bolts into the concrete ground.
A
3.2 MOUNTING AREA HAS CONCRETE SURFACE
180
260
60
0
600