Page 4
Page 5
LOCATION
To comply with recommendations
from the health and safety executive
it is important that due consideration
be given to safe operation of the
controls of the boiler. The boiler
should therefore be mounted in such
a manner that the operator can stand
directly facing the machine with the
controls at a recommended height
from the floor of /- 100mm.
Consideration should also be given
to the servicing requirements of the
machine. The maximum and minimum
COLD WATER INLET
ambient operating conditions are 35 °C and 5 °C respectively.
The appliance is not suitable for installation where a water jet
could be used. Install the boiler on a surface suitable for near
boiling temperatures and the working weight of the boiler. Allow
adequate clearance for ventiation and for the easy removal of
the outer casing lid and rear panel. Calomax ltd recommend a
minimum clearance of 50mm on all sides of the boiler . A suitably
qualified engineer must install this unit. Plumbing and electrical
installation work is involved.
To comply with the U.K. Water Supply Regulation a single check-
valve must be fitted to the supply. BEFORE CONNECTING, THE
SUPPLY PIPE MUST BE THOROUGHLY FLUSHED OUT TO
ENSURE THAT FOREIGN MATTER DOES NOT BLOCK OR
ENTER THE SOLENOID VALVE
The boiler must be connected to a potable water supply using
the food grade hose provided, in a manner which complies
with appropriate local water regulations. The hose should
be connected to a ½” (15mm) drinking water supply via an
appropriate isolating valve. The supply must provide a constant
pressure of between 20 KPa and 1000 KPa (0.2 to 10 Bar).
If the water supply contains excessive solids in suspension it is
recommended that a fine mesh “in-line” water filter is fitted in the
pipe work after the stop cock. Failures due to scale and sediment
are not covered by the warranty.
INSTALLATION
All metallic components of the machine, in direct contact with
drinking water are manufactured from high quality 304 grade
stainless steel, or non-ferrous materials, providing maximum
resistance to corrosion.
CONSTRUCTION
MODEL
A
B
C
D
E
DRY
WEIGHT
WORKING
WEIGHT
Quasar
2
mm
546
240
410
201
65
12 KG
29 KG
DIMENSIONS AND WEIGHTS
The boiler must be installed in a location where access is
restricted to operators that are suitably trained, or where
untrained operators of the machine can be supervised by trained
personnel.
1200
±1
0
0
B
C
E
D
A