background image

2. PLANNING THE

INSTALLATION

All installation and maintenance work must be

carried out by competent persons

2.1 Water Requirements

The unit is designed to be connected to a cold water rising
mains supply, using 15mm Table 'X' copper tube. with a
minimum pressure of 20 KPa (0.2bar) and a maximum
pressure of 1000 KPa (50bar).

to the cold water mains

supplying the boiler. It is also recommended that an
isolating valve be fitted to the mains water supply to
facilitate maintenance.

The formation of scale in hard water areas is a problem
associated with all hot water appliances. Damage to the
boiler caused by excessive scale deposits is not covered
by the manufacturer's warranty.

So as to comply with the U.K. Water Supply Regulations a
single-check valve must be fitted

2.2 Electrical Requirements

The installation must comply with the current I.E.E. Wiring
regulations, if in doubt consult a qualified electrician.
This appliance must be earthed.
The boiler complies with the Electrical Equipment Safety
Regulations (SI1994/3260) and has been independently
tested to BS EN 60335-2-63 :.
The boiler operates a nominal 3 kW element at 240V.
50Hz. supply. A circuit diagram is provided on page 9.

2.3 Installation Location

To comply with recommendations from the health and
safety executive it is important that due consideration
be given to the safe operation of the controls of the
boiler. The boiler should therefore be mounted in such
a manner that the operator can stand directly facing
the machine with the controls at the recommended
height .

Consideration should also be given

to the servicing requirements of the machine.

S

Ensure

the type of wall construction and fixings are suitable
to support the working weight of the boiler
S

ee fig. 1

ee fig.3

2.4 Vent / Overflow Pipe Requirements

The vent and overflow pipe should be extended on site
using 15mm Speed-fit plastic tube or 15mm Table 'X'
copper tube. The pipe must be laid with a

,

discharging to a safe and visible position.

continuous fall

The vent and

overflow pipe should not be connected directly to a
soil pipe and should never be allowed to become
blocked or restricted .See fig 2

The height from floor
to draw off tap handle
should be /-
100mm

Fig 1

Model

Physical Dimensions

Weights (kg)

A

B

C

Dry

Working

5L

511

313

226

10

17

7.5L

582

368

251

13

24

10L

582

368

251

13

27

15L

623

401

274

15

35

All dimensions in mm

Fig 3

ü

û

Incorrect

Correct

ü

Correct

Vent and Overflow

Pipe-work should be fitted with a
continuous fall to a safe and visible point
of discharge (e.g. a sink).

It should not be

connected directly to a waste system
because taste and smell problems will
occur.

This installation allows the silicone hose to
fit loose inside a fixed fitting. Air is allowed
into the boiler at this point and will allow
the boiler to breath in the event of the
overflow becoming trapped.

Trapped water

prevents boiler

breathing

Fig 2.

Fig 4

Vent / Overflow

Solenoid water
inlet

Cable entry clamp

Issue 17

page 5

Issue 17

page 5

Содержание Clipper2

Страница 1: ...MAINTENANCE MANUAL Patented Wall mounted Catering Water Boiler Read these instructions thoroughly before commencing installation or undertaking maintenance work Issue 17 DCR 668 9 5 05 TEL 0113 249 6681 FAX 0113 235 0358 www calomax co uk ...

Страница 2: ...d fascia houses light PCB COMLPCBA NB5B Body NB5BLG Body lid gasket NBSV solenoid valve CASPCBT Printed circuit board includes Triac PCB for single thermistor units only NB5WLCPT Water level control pipe NBMR Manual reset Note For the Outer Casing order NB5OCWSS Stainless Steel or NB5OCWMS White For an Insulation set order NB5IS Vent and overflow pipe with screen UTHSG Heat Shroud If parts require...

Страница 3: ...bly UTB Draw off tap body 7 5PMFK Plastic moulded fascia houses light PCB COMLPCBA NB10B Body NB10BLG Body lid gasket NBSV solenoid valve CASPCBT Printed circuit board includes Triac PCB For single thermistor machines only NB7 5WLCPT Water level control pipe NBMR Manual reset Note For the Outer Casing order NB10 OCWSS Stainless Steel or NB10 OCWMS White For an Insulation set order NB10IS Vent and ...

Страница 4: ... 15BCW Washe r Body and Backpla te cut away to show internal compon ents GTT Tap top assem bly UTB Draw off tap body 10PMF K Plastic mould ed fascia house s light PCB COML PCBA NB10B Body NB10B LG Body lid gaske t NBSV soleno id valve CASPC BT Printe d circuit board includ es Triac PCB F or sungle themis tor units only NB10W LCPT Water level contro l pipe NBMR Manua l reset Note For the Outer Casi...

Страница 5: ...nclude s Triac PCB Fo r single thermis tor units only NB15W LCPT Water level control pipe NBMR Manual reset Note Vent and overflow pipe WITH SCREE N For the outer ca sing order NB15OC WSS Stainle ss steel or NB15OC WMS white For insulati on set order NB15IS UTHSG Heat Shroud NBWPT water pipe GTT grey tap top UTB univers al tap body 15PMFK plastic moulde d fascis houses light PCB CO MLPCB A If part...

Страница 6: ...ght PCB COMLPCBA NB15B Body NB15BLG Body lid gasket NBSV solenoid valve CASPCBT Printed circuit board includes Triac PCB For single thermistor units only NB15WLCPT Water level control pipe NBMR Manual reset Note Vent and overflow pipe WITH SCREEN For the outer casing order NB15OCWSS Stainless steel or NB15OCWMS white For insulation set order NB15IS UTHSG Heat Shroud NBWPT water pipe If parts requi...

Страница 7: ... should therefore be mounted in such a manner that the operator can stand directly facing the machine with the controls at the recommended height Consideration should also be given to the servicing requirements of the machine S Ensure the type of wall construction and fixings are suitable to support the working weight of the boiler S ee fig 1 ee fig 3 2 4 Vent Overflow Pipe Requirements The vent a...

Страница 8: ...ler is only part full or a light when maximum draw off capacity is available If the available water is drawn from the boiler the flow rate will reduce to a trickle as the unit fills and heats the water this does not indicate a fault with the boiler The light will continue to show as the temperature of the water is still approximately 98 C Due caution should be exercised as the water is approximate...

Страница 9: ... now be de scaled Fig 7 Scale deposits should be removed from all internal surfaces particularly the heating element thermistor pocket etc by gently tapping or scrapping If the deposits are soft use a nylon pad and flush out Abrasive cleaning materials containing scouring powders and detergents must not be used such materials can cause taste problems Chemical de scalants must only be used in accor...

Страница 10: ...uring low barometric pressure conditions causing the unit to trip the overheat cut out device Any adjustments made to the P C B should be noted on the boiler to aid fault diagnosis if problems persist Issue 17 page 8 Issue 17 page 8 7 FAULT FINDING To protect the unit in the event of continuous over boiling the unit is fitted with a thermal cutout device This device will cut power to the entire ma...

Страница 11: ...ED TERMINAL BLOCK GREEN YELLOW BLACK RED E N L WIRING DIAGRAM FOR CLIPPER2 WATER BOILERS using v10 pcb board WIRING DIAGRAM FOR CLIPPER2 WATER BOILERS using v11 pcb board ELEMENT OUTER CASING EARTH ON ON CONDENSER EARTH CONNECTION ON WATER TANK EARTH CONNECTION CONNECTIONS EARTHING BACKPLATE PCB BLACK RED 0 75mm YELLOW OR BLACK 0 2mm YELLOW TRIAC PCB BLACK RED WHITE NORMAL WATER SENSOR SENSOR EART...