background image

 

&

$

'

 ! "# $%

 

10 

 

Lerchenfeldstr. 9   87600 Kaufbeuren   Tel.: +49(0)8341 / 9764-0 Fax: +49(0)8341 / 67806

 

 

Option (not included) 
Quick connector for battery "Quick power", part no. H10 432 0110 00 
Temperature sensor for battery part no. H10 012 0003 00 
Charge control panel LK-Panel V part no. H10 012 0143 00 

The device should be set up in a location not exposed to humidity and damp. 
The  setting  up  location  must  be  clean,  dry  and  well-ventilated.  During 
operation,  the  housing  may  heat  up  to  approx.  75°  C.  Therefore  maintain  a 
minimum clear distance of 100 mm and make sure that the ventilation slots are 
not covered. 

Length: 502 mm / Width: 373 mm / Height: 210 mm 

The  space  provided  for  the  device  must  not  be  smaller  than  the  dimensions 
specified here, since a minimum clear distance of 100 mm must be provided all 
the way around it. 

The separate box for the device must be provided with ventilation holes at the 
top and sides, with a total area of 10,000 mm². 

The charger should be placed as close as possible to the battery, but always in 
a  separate  box.
  The  box  for  the  battery  must  have  a  ventilation  hole  facing 
towards the outside. 

Attach the device securely with the four fastening screws supplied. The legs of 
the device can be turned 90°. To do so, the bolts at the legs must be loosened. 
Then the legs can be turned and re-tightened. 

Important 
Make  sure  that  the  ventilation  slots  remain  unobstructed!  The  minimum  clear 
distance  must  be  100  mm  all  around!  Insufficient  ventilation  can  cause 
overheating of the device! 

The device is designed for operation in ambient temperatures of up to 35° C. If 
the temperature inside the device rises due to a lack of air circulation or due to 
high  ambient  temperature,  the  charging  current  is  automatically  reduced  in 
steps. 

 

 

Handling of the cage tension spring clamps  

Prepare the connecting cable. The cable end for the connection B+ (small cage 
tension spring clamp) must be stripped 8–9 mm. The cable ends for the battery 

Содержание Ladeautomat LG 415/24-DS/IU

Страница 1: ...Lerchenfeldstr 9 87600 Kaufbeuren Tel 49 0 8341 9764 0 Fax 49 0 8341 67806 Betriebsanleitung Operating Instructions Mode d emploi Ladeautomat LG 415 24 DS IU...

Страница 2: ...Verwendungszweck 3 Beschreibung 4 Anschl sse 5 Ladevorgang 6 Technische Daten 7 Ladekennlinie 8 Montage 9 Aufstellen 9 K figzugfederklemmen 11 Anschluss 12 Anschlussplan 14 Inbetriebnahme 15 Wartungs...

Страница 3: ...f da Kinder keinen Zugriff darauf haben Schutz vor elektrischem Schlag Betreiben Sie nur Ger te deren Geh use und Leitungen unbesch digt sind Achten Sie auf sichere Verlegung der Kabel Ziehen Sie nich...

Страница 4: ...ist ein Produkt modernster mikroprozessorgesteuerter Ladetechnik Diese Technik erm glicht hohe Leistung bei geringem Gewicht und kleinen Abmessungen Durch Verwendung hochwertiger Elektronik arbeitet e...

Страница 5: ...ne Verwendung eines Temperaturf hlers regelt der Ladeautomat den Ladevorgang wie bei einer Batterietemperatur von 20 C Das Ger t ist f r den Betrieb in einer Umgebungstemperatur bis 35 C ausgelegt Ste...

Страница 6: ...emperatur Die Ladespannung wird ber eine Zeitdauer von zehn Stunden bei Gelbatterien bzw vier Stunden bei Fl ssigelektrolytbatterien konstant auf 28 8 Volt gehalten Nach Ablauf dieser Zeit erfolgt ein...

Страница 7: ...ik Erhaltungsladung Erhaltungsladung konstant 27 6 V Temperaturabh n gige Regelung optional Die Werte der Schaltautomatik beziehen sich auf eine Batterietemperatur von 20 C Unter Verwendung eines Temp...

Страница 8: ...67806 Geh use Aluminium schwarz rot lackiert bel ftet L nge Breite H he 302 mm ohne F e 173 mm ohne F e 100 mm Gewicht 3 kg 30 N Ladekennlinie HL NL EL Hauptladephase Nachladephase Erhaltungsladg Bild...

Страница 9: ...m ssen Ladeger t und die Batterie unbedingt in voneinander getren nten und gut bel fteten Boxen installiert werden Die Montage und der Anschluss von elektrischen Ger ten sollte grunds tzlich durch gee...

Страница 10: ...leistet sein mu Die separate Box f r das Ger t mu oben und seitlich mit L ftungs ffnungen versehen sein die eine Gesamt ffnung von 10 000 mm ergeben Das Ladeger t m glichst in der N he der Batterie ab...

Страница 11: ...ubendrehers ge ffnet werden F hren Sie hierzu den Flachschraubendreher in die untere quadratische ffnung Bild 3 und dr cken Sie die Zugfederklemme auf Bild 4 Der Klemmteil der Feder in der oberen rund...

Страница 12: ...squer schnitt 6 mm L nge ber 6 m Leitungsquer schnitt 10 mm Me leitung B rot L nge bis 10 m Leitungsquer schnitt 0 75 mm Verbinden Sie das Ladeger t gem Anschlussplan mit der Batterie Verwenden Sie hi...

Страница 13: ...Sie die Schutzfolie am Klebepunkt des Temperaturf hlers und dr cken ihn kr ftig auf die gew nschte Position an der Batterie siehe Beschreibung Temperaturf hler Stecken Sie das Kabel des Temperaturf hl...

Страница 14: ...14 Lerchenfeldstr 9 87600 Kaufbeuren Tel 49 0 8341 9764 0 Fax 49 0 8341 67806 Anschlussplan 0 1 2 0 3 0 4 56 7 8 7 7 4 0 9 4 9 56 Bild 6 Anschlussplan...

Страница 15: ...ennspannung von 24 Volt und eine Mindestkapazit t von 50 Ah Batterien unter dieser Mindestkapazit t werden nur unzureichend geladen Batterien mit einer zu hohen Kapazit t werden zu langsam geladen Ach...

Страница 16: ...tecker am Ger t aus und wieder ein Pr fen Sie die Sicherungen und den Netzanschluss Die Spannung der Batterie ist unter 3 Volt gesunken Starten Sie den Motor und lassen Sie ihn ca 30 Sekun den laufen...

Страница 17: ...ngel infolge Material oder Fertigungsfehler werden kostenlos beseitigt wenn Das Ger t dem Hersteller kostenfrei zugesandt wird der Kaufbeleg beiliegt Das Ger t bestimmungsgem behandelt und verwendet...

Страница 18: ...18 Lerchenfeldstr 9 87600 Kaufbeuren Tel 49 0 8341 9764 0 Fax 49 0 8341 67806...

Страница 19: ...Lerchenfeldstr 9 87600 Kaufbeuren Tel 49 0 8341 9764 0 Fax 49 0 8341 67806 19...

Страница 20: ...nections 5 Charging process 6 Technical data 7 Charging characteristic curve 8 Assembly 9 Setting up 9 Cage tension spring clamps 11 Connection 12 Connection diagram 14 Commissioning 15 Maintenance in...

Страница 21: ...not have access to them Protection against electric shock Only operate devices whose housing and cables are undamaged Ensure safe cable positioning Do not pull cables Attention Safeguard the electric...

Страница 22: ...By using high quality electronics it operates with high efficiency Automatic charging affords protection and prevents harmful battery overload This considerably extends the life of the battery Once co...

Страница 23: ...charging current is automatically reduced in steps Connections 1 Mains connection for female device plugs 5 Output charge cable for battery 2 Connection for charge control panel 6 Connection for tempe...

Страница 24: ...or four hours for gel batteries and liquid electrolyte batteries respectively After this time the device switches to the charge phase If during this phase the current rises above 90 of the rated curr...

Страница 25: ...ies Four hours constant 28 8 V in the case of liquid batteries Automatic switching Holding charge Holding charge constant at 27 6 V Temperature dependent control optional The values of the automatic s...

Страница 26: ...150 Ah Dimensions weight Housing Aluminium painted black red ventilated Length Width Height 302 mm without legs 173 mm without legs 100 mm Weight 3 kg 30 N Charging characteristic curve HL NL EL Main...

Страница 27: ...he battery must be installed with physical separation between them and in well ventilated boxes The assembly and connection of electric devices should always be carried out by qualified personnel Alwa...

Страница 28: ...on holes at the top and sides with a total area of 10 000 mm The charger should be placed as close as possible to the battery but always in a separate box The box for the battery must have a ventilati...

Страница 29: ...ening fig 3 and open the tension spring clamp fig 4 The clamping element of the spring in the upper round opening opens Insert the cable into the cage tension spring clamp up to the isolation upper ro...

Страница 30: ...the charger to the battery in accordance with the connection diagram Use the provided cables to do this Pay attention to the cable cross sections and ensure correct polarity Connect the negative charg...

Страница 31: ...onnect the cable of the temperature sensor to the temperature sensor connection of the device 2 pole connection When the device is delivered it is set to operation with liquid electrolyte batteries If...

Страница 32: ...56 0 7 0 8 7 7 9 9 56 Fig 6 Connection diagram Commissioning The charger is operational as soon as it is connected to the mains Before breaking or making direct current connections e g the charging ca...

Страница 33: ...ty that is too high are charged too slowly Attention Batteries with short circuited cells must not be charged Explosion hazard due to the generation of oxyhydrogen gas Charging process Battery chargin...

Страница 34: ...the device and plug it back in Check the fuses and the mains connection The voltage of the battery has dropped below 3 volt Start the motor and let it run for approx 30 seconds Battery voltage rises...

Страница 35: ...sing from material or manufacturing faults will be rectified free of charge provided that The device is sent to the manufacturer postage paid Proof of purchase is enclosed The device has been handled...

Страница 36: ...6 Processus de chargement 6 Caract ristiques techniques 8 Courbe caract ristique de chargement 10 Montage 11 Installation 11 Bornes cage ressort de tension 13 Raccordement 14 Sch ma de raccordement 16...

Страница 37: ...appareils lectriques proximit de liquides ou de gaz inflammables Installez vos appareils lectriques de telle mani re que les enfants ne puissent pas y acc der Protection contre des chocs lectriques N...

Страница 38: ...pour effectuer le chargement de batteries au plomb 6 Volts et 12 Volts Si des batteries de tension nominale 6 Volts ou 12 Volts sont charg es avec le chargeur alors le d gagement gazeux intervient im...

Страница 39: ...u moyen d un pupitre de contr le de charge comme par ex le CALIRA LK Panel V Les ventuels d fauts du chargeur sont aussi affich s sur le pupitre CALIRA LK Panel V Si le chargeur est mis en uvre avec u...

Страница 40: ...Batterie lectrolyte liquide Figure 1 Raccordements Processus de chargement Le chargeur poss de une protection de polarisation lectronique Le courant de charge est lib r uniquement lorsque la batterie...

Страница 41: ...it une commutation vers la phase de maintien de la charge Si pendant cette p riode les 90 du courant nominal sont d pass s ou si la tension de la batterie passe en dessous de 26 4 Volts pour plus de q...

Страница 42: ...heures pour les batteries lectrolyte g lifi 28 8 V constants pendant quatre heures pour les batteries liquides Commutation automatique Charge de maintien Charge de maintien tension constante 27 6 V R...

Страница 43: ...trotechniciens Allemands VDE et de la loi sur la s curit des appareils Marque de conformit Utilisation Appareil destin au chargement de batteries de tension nominale 24 V et de capacit 50 150 Ah Dimen...

Страница 44: ...4 0 Fax 49 0 8341 67806 Courbe caract ristique de chargement HL NL EL phase de charge principale phase de charge compl mentaire phase de charge de maintien Figure 2 Courbe caract ristique de charge tr...

Страница 45: ...rativement tre install s dans deux caissons s par s l un de l autre et bien ventil s Le montage et le raccordement des appareils lectriques doivent par principe tre r alis s par des sp cialistes quali...

Страница 46: ...space minimal de 100 mm sur tout le tour Le caisson s par de l appareil doit tre quip sur le haut et sur le c t d ouvertures d a ration qui offrent une ouverture totale de 10 000 mm Placer le chargeur...

Страница 47: ...s plat adapt Introduire pour ce faire le tournevis plat dans l ouverture carr e inf rieure figure 3 et appuyer pour ouvrir le blocage de la borne ressort de tension figure 4 La pi ce de serrage du res...

Страница 48: ...tion 10 mm C ble de mesure B rouge Longueur max 10m section 0 75 mm Proc der au raccordement du chargeur avec la batterie selon le sch ma de raccordement Utiliser pour ce faire les c bles fournis avec...

Страница 49: ...otection au point de collage du capteur de temp rature et coller celui ci en l appuyant fortement la position d sir e de la batterie voir la description du capteur de temp rature Brancher le c ble du...

Страница 50: ...16 Lerchenfeldstr 9 87600 Kaufbeuren Tel 49 0 8341 9764 0 Fax 49 0 8341 67806 Sch ma de raccordement 4 9 4 Figure 6 Sch ma de raccordement 0 A 0 0 B 1 C B 56 7 8 7 7 0 D 0 9 0 B 0 9 56...

Страница 51: ...ominale de 24 Volts ainsi qu une capacit d au moins 50 Ah Les batteries qui ont une capacit minimale inf rieure ces valeurs ne seront qu insuffisamment charg es Les batteries avec une capacit trop lev...

Страница 52: ...D branchez puis rebranchez le connecteur femelle de l appareil V rifier les fusibles et la connexion au r seau La tension de la batterie est tomb e en dessous de 3 Volt D marrez le moteur et laissez l...

Страница 53: ...sont r par s gratuitement lorsque L appareil a t renvoy sans frais au fabricant La quittance d achat a t jointe L appareil a t manipul et utilis conform ment aux prescriptions Aucune pi ce de rechange...

Страница 54: ...20 Lerchenfeldstr 9 87600 Kaufbeuren Tel 49 0 8341 9764 0 Fax 49 0 8341 67806...

Страница 55: ...Lerchenfeldstr 9 87600 Kaufbeuren Tel 49 0 8341 9764 0 Fax 49 0 8341 67806 21...

Страница 56: ...0 0 E 0 F 0 0 B G B 0H B B I J 0 K J 4 0 L 0 0 0B 5 0 0 B0 2 K 2 0H K F F 0 8 F 0 J 4 3 0 Rue et n M N F 0 0 O 0 8 B B B 2 0 2B 0 H B50 040274 01...

Отзывы: