
CALIFORNIA ACCENT LIGHTING, INC.
2820 E. Gretta Lane, Anaheim, CA 92806
ph. 800.921.CALI (2254) | fx. 714.535.7902 | [email protected] | calilighting.com
© CALI. All rights reserved. CALI reserves the right to make changes or withdraw specifications without prior notice.
4 / 2 / 2022 / Rev 4
Page 5 of 20
ALS
500T-SWM-FG
INSTALLATION INSTRUCTIONS
Mounting (Wall Trim & Mounting Bracket Assembly) 1 of 2
Mount Wall Trim
Ceiling Line
6-1/8”
5/8” Drywall
T-Bar
Support Wire
Wall Stud
Maintain
Continuous Edge
Hang luminaire
on Wall Trim
Hold in place
Ceiling Line
4”
5/16”
Hex Nut
Lock Washer
Hex Head Bolt
Slide Mounting Brackets
onto Luminaire
Each Mounting Bracket secures
the luminaire to the Wall Trim
Do not install ceiling tiles until after installation of luminaires is complete.
Installation area must have at least 10” of overhead space.
1
Determine number of Mounting Brackets required.
Note:
Refer to the diagrams on page 16 as a guide.
5
If applicable, assemble Mounting Brackets. Insert Hex Head Bolts through holes,
then place Lock Washer and Hex Nut on bolts. Leave the assembly loose for now.
6
Hang luminaire from mounted Wall Trim and hold in place. Have another person
slide Mounting Brackets onto luminaire and Wall Trim. Tighten bracket nuts
slightly so the bracket securely holds the luminaire in place. Do not tighten nuts
completely at this time.
7
Install T-Bar ceiling grid. Assemble the grid so there is a continuous edge
around grid for the Ceiling Trim to rest on. Hang the center of the T-Bar 6-1/8”
away from wall stud.
2
Mark locations along Wall Trim extrusion where it will be mounted to wall studs,
then drill holes as needed and mount to wall studs.
Note:
Mount Wall Trim extrusion using at least 1 screw per 2’, rounded up.
4
Hang or cut drywall along installation area so it is exactly 4” above ceiling line.
Note:
Drywallers must hang drywall to the specifications. Only cut if necessary.
3