Installation

The  SATK  series  HIU  is  designed  for  installation  in  a  sheltered

domestic environment (or similar), therefore cannot be installed or

used  outdoors,  i.e.  in  areas  directly  exposed  to  atmospheric

agents.  Outdoor  installation  may  cause  malfunctioning  and

hazards.

If  the  device  is  enclosed  inside  or  between  cabinets,  sufficient

space must be provided for routine maintenance procedures. It is

advisable to avoid positioning electrical devices under the HIU to

avoid  the  risk  of  damage  in  the  event  of  leaks  from  hydraulic

fittings. If this advice is not heeded, the manufacturer cannot be

held responsible for any resulting damage.

In the event of a malfunction, fault or incorrect operation, the device

should  be  deactivated;  contact  a  qualified  technician  for

assistance.

Preparation

After  having  established  the  point  where  the  device  has  to  be

installed, perform the following operations: 

· Mark the holes required for securing the HIU to the wall

· Mark the position of the hydraulic connections

Check  the  measurements  again  and  begin  laying  the  following

lines:

Hydraulic (see page 5):

1. connection to the central system line

2. heating circuit connection

3. domestic water circuit connection

Electric (see page 13):

1. 230 V (ac) – 50 Hz electric supply line

2. chrono-thermostat/thermostat line (potential-free)

3. centralised bus line for heat meter data transmission (if required)

4. centralised electric supply line for heat meter (if required)

Before installation, it is recommended to carry out accurate flushing

of  all  the  pipes  of  the  system  in  order  to  remove  any  residue  or

impurities that could endanger correct operation of the HIU. 

Fix the HIU to the wall.

N.B.

the  wall  anchors  (not  supplied)  can  only  guarantee  effective

support  if  inserted  correctly  (in  accordance  with  good  technical
practice) into walls built using solid or semi-solid bricks. If working
with  walls  built  using  perforated  bricks  or  blocks,  mobile  dividing
panels  or  any  masonry  walls  other  than  those  indicated,  a
preliminary static test must be carried out on the support system.

Electric connections

Make sure that the electrical system can withstand the maximum

power consumption of the appliance, with particular emphasis on

the cross-section of the cables.

If you have any doubts, contact a qualified technician to request a

thorough check of the electrical system.

Electrical  safety  of  the  appliance  is  only  achieved  when  it  is

correctly  connected  to  an  effective  earthing  system,  made  as

specified in current safety regulations. This is a compulsory safety

requirement. 

Connection to the main supply

The device is supplied with an electric supply cable which is not

fitted with a plug.

The device should be electrically connected to a 230 V (ac) single-

phase + earth mains supply using the three-wire cable marked with

the label shown alongside, observing the LIVE (L) - NEUTRAL (N)

polarities and the earth connection. This line must be connected to

a circuit breaker device.

Connection to the chrono-thermostat

The  SATK  series  HIU  is  fitted  for  connection  to  a  thermostat  or

chrono-thermostat,  both  standard  and 

OpenTherm

,  for  ambient

temperature adjustment.

The  connection  to  this  device  (

potential-free  contact

)  must  be

made with the two-wire cable marked with the label shown below.

Should it be necessary to extend this cable, use one with the same

cross-section (max 1 mm

2

) and maximum length 30 m.

Raumthermostat

(Potenzialfreier Kontakt)

Sonde d’ambiance

(Contact sec)

Termostato de ambiente

(Contacto sin potencial)

Ruimtesensor

(Schoon contact)

WARNING!

DO NOT CONNECT EXTERNAL

VOLTAGE SUPPLY TO THESE

TERMINALS

ATTENZIONE!

NON ALIMENTARE IN TENSIONE

Termostato ambiente

(Contatto pulito)

Room thermostat

(Volt free connection)

Fitting the cover

Place the casing over the frame, inserting the upper tabs (1) into

the corresponding slots (2).

Place the lower part of the casing over the frame. 

Tighten the screws (3).

3

2

1

Commissioning

Filling the central heating system

Open the shut-off valves on the connections to the centralised line

and,  in  the  central  heating  system,  proceed  with  charging  the

system to the design pressure.

Once these procedures are complete, vent the system and check

its pressure again (repeat the filling process if necessary)

System start-up

Before  starting  the  HIU,  visually  check  the  hydraulic  connection

water-tightness  and  the  electric  wiring.  After  finishing  the  check,

activate the electric supply to the HIU and check for the presence

of any error signals.

If  there  are  any,  eliminate  the  fault  indicated  and  proceed  as

described below, setting the set point of the domestic water and

heating  cycles,  programming  the  thermostat/chrono-thermostat

according to the desired temperatures and times, and checking the

operating cycles.

Содержание SATK20 Series

Страница 1: ...ms Product range SATK20103HE Direct wall mounted HIU for LOW temperature heating instantaneous domestic hot water production power capacity 40 kW SATK20203HE Direct wall mounted HIU for MEDIUM tempera...

Страница 2: ...high intensity electromagnetic fields This device cannot be used in areas at risk of explosion or fire 3 The device must be connected to an independent bipolar switch If work has to be done on the de...

Страница 3: ...ell cover EPP Heat exchanger brazed stainless steel SATK20305 technical specifications Medium water Maximum percentage of glycol 30 Maximum medium temperature 85 C Maximum working pressure primary cir...

Страница 4: ...ontact a qualified technician to request a thorough check of the electrical system Electrical safety of the appliance is only achieved when it is correctly connected to an effective earthing system ma...

Страница 5: ...centralised system It is advisable to install manual shut off valves not supplied also on the bottom connections to the apartment circuits Before installation it is recommended to carry out accurate...

Страница 6: ...r steady illumination of the LEDs ON Electric supply 230 V ac DHW Domestic cycle CH Heating cycle FAULT Fault detected Domestic cycle Heating cycle Operating principle All heating and domestic hot wat...

Страница 7: ...lty safety valve is working properly again Thermal safety valve fault SATK20103HE LOW temperature Error code 76 76 Removing a fault Normal operating conditions are restored automatically once the faul...

Страница 8: ...ner heat meter flow probe pocket 18 Primary circuit shut off valves SATK20103HE LOW temperature heat interface unit with high efficiency pump Functional characteristics Heating range 45 75 C Set point...

Страница 9: ...a temperature of 45 C Once the maximum set point has been reached the function is executed following the same procedures in reverse from the maximum set point to the minimum set point This function h...

Страница 10: ...ctory settings 1 2 3 4 5 6 4 ON Functional characteristics Maximum heating temp 85 C ON OFF regulation DHW production range 42 60 C Optional functions Domestic cycle DHW pre heating function 1 2 3 4 5...

Страница 11: ...circulate at the temperature supplied by the central heating system ON OFF regulation The valve is closed on completion of the heating cycle The active heating cycle is signalled by lighting of the ye...

Страница 12: ...inserted Replacing the valve actuator Disconnect the actuator cable lightly pressing the tab on the connector and extracting it see page 13 ref 4 8 Extract the fixing clip D and then the actuator Posi...

Страница 13: ...pulito Room thermostat Volt free connection This connection may not be available To be wired during installation Room thermostat not supplied potential free line MAX 30 m 6 ON Dip switch 6 configurati...

Страница 14: ...d heat exchanger partly clogged call qualified personnel to have it serviced modulating valve actuator faulty call qualified personnel to have it replaced valve obturator blocked in intermediate posit...

Страница 15: ...ced primary circuit flow rate insufficient contact person in charge of system centralised system not working contact person in charge of system CH LED off chrono thermostat time setting incorrect chec...

Страница 16: ...ve result Are the connections compliant with specifications and made in accordance with best practices 13 all Are the shut off valves open 14 all Has the visual inspection of the hydraulic connections...