background image

8

Operating principle

The 1522 series regulator automatically manages a system composed of a solid fuel generator, integration gas boiler, inertial water storage in

parallel on the heating system and domestic hot water production by means of a water storage.

When the minimum working temperature of the solid fuel generator has been reached (as detected by probe S1), the regulator starts pump P1,

diverts valve V1 to connect the heat exchanger to the system and starts pump P2. With the solid fuel generator off or not yet at working

temperature, the regulator starts the integration boiler by means of contact C, stopping pumps P1 and P2 and diverting diverter valve V1 to the boiler.

In the case of a solid fuel generator overtemperature, the regulator sends the flow rate of the secondary circuit either to the system (in the

presence of a room thermostat demand) or to the domestic water storage if it is not yet at

operating  temperature  or  lower  than  the  limit  temperature.  The  domestic  water  storage  is

maintained at operating temperature by probe S2 and priority diverter valve V2. The regulator

performs  thermal  disinfection  of  the  domestic  water  storage  in  accordance  with  four

user-selectable  preset  programs,  keeping  it    for  two  hours  at  the  disinfection  temperature

“Legio.-Temp”, settable in the range 40–75°C. The user can anyway add further disinfection

periods (designated TP points in the menu).

The inertial water storage in parallel is managed in accordance with the logic described on

page 6. By means of diverter valve V5 (not supplied in the pack, e.g.: Caleffi 6443..3BY series

+ relay box code F29525) the regulator manages all phases of  loading and unloading of the

water storage, which is kept closed only if the gas boiler has been activated. Connection of the parallel water storage to the rest of the system

is managed by the regulator by comparing the temperature readings of probes S1 (located on the solid fuel generator flow pipe), S5 (located

on the heat exchanger return line) and S4 (located on the parallel water storage). For probe S5 it is advisable to use the following working

set-points: 45°C for radiator systems, 30°C for radiant panel systems. The gas boiler starts when the solid fuel generator temperature is below the

minimum working temperature TSG (measured by probe S1) and the heat exchanger return temperature TR (measured by probe S5) is 5°C below the

value set on the regulator (TR set, fixed hysteresis value 5K).

 

-

+

Optimiser 

V5

F29525

K

V2

C

P1 P2

C

V1

RT

S2

S1

S5

S4

V5

K

S1

K

S1

M

M

D

D

T

P1

V2

P2

C

V1

S2

RT

D

S4

S5

 

 

 

 

   

          

 

   

 

   

     

 

 

 

 

 

   

          

Com.

Relè 1 VA

        8 VA

L

N

N

10

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wiring diagram

L  Live
N  Neutral
L’  Live jumper
1  ON pump P1
2  ON pump P2

4

ON diverter valve V1

5

NO

ON diverter valve V2 
for domestic priority

5

NC

10 ON valve V5 to load 

the parallel water 
storage

y1  Probe S1
y2  Probe S1

y4  Probe S5

Probe S4

y5  Probe S5 and

S4 common

y6

x2 Room thermostat 

RT contact

x3 Room thermostat 

RT contact

x4 Domestic water 

storage probe S2

x5 Domestic water 

storage probe S2

wiring to be made

Heating

system

Domestic
water
system

DCW

DHW

Open vessel

Closed vessel

6  Solid fuel 

generator K

3  Gas generator C

3’  Gas generator C

N

Neutral common

6’  Solid fuel 

generator K

N

Neutral common

SOLID FUEL

GENERATOR

SOLID FUEL

GENERATOR

INERTIAL

WATER

STORAGE

IN PARALLEL

HEATING

BOILER

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

   

 

 

     

 

 

 

 

 

 

 

 

 

 

Wiring diagram of F29525

relay box - 230 V ˜ 50 Hz 

Regulator 152200

V5=Zone valve 6443..3BY

 

   

 

   

     

 

 

V5

D

V5

D

ON

1 2 3 4

Program

Disinfection 

day

Disinfection

time slot

0

No disinfection

1

Mon.

2-4

2

Sat.

10-12

3

Sun.

10-12

4

Mon. and Wed.

2-4

Program 5 (software code PR84)

Heating, domestic hot water with s management of inertial water storage in parallel on the heating system. 

Number of probes utilised: 4

Probe S1 located on solid fuel generator flow 

Probe S2 (not supplied in the pack) located on domestic water storage

Probe S5 located on heat exchanger inlet on secondary side of circuit

Probe S4 located on the inertial water storage in parallel on the heating system

Содержание BIOMASS OPTIMISER 1522 Series

Страница 1: ...m according to the heating circuit needs Depending on the type and quantity of installed probes the regulator supports the following system solutions heating production of domestic hot water by means...

Страница 2: ...acilitate any system checks to be performed When the solid fuel generator is equipped with an anti condensation valve it is good practice to set the minimum working temperature of the solid fuel gener...

Страница 3: ...20 1078 95 1366 25 1097 100 1385 30 1117 105 1404 35 1136 110 1423 40 1155 115 1442 45 1175 120 1461 50 1194 140 1536 55 1213 160 1611 60 1232 170 C 20 18 16 14 12 10 8 6 4 14616 13211 11958 10839 98...

Страница 4: ...is equipped with a solid fuel generator overtemperature monitoring function When the user settable emergency temperature is reached on the solid fuel generator the regulator generates an alarm signal...

Страница 5: ...eating management of inertial water storage in parallel on the heating system S1 S4 S5 PR83 7 5 Heating and domestic hot water with storage management of inertial water storage in parallel on the heat...

Страница 6: ...ed heat energy is thus drawn from the parallel water storage Phase 4 gas boiler activation Only when the solid fuel generator is not operating and the parallel water storage has no energy reserve it i...

Страница 7: ...s S1 located on the solid fuel generator flow pipe S5 located on the heat exchanger return line and S4 located on the parallel water storage For probe S5 it is advisable to use the following working s...

Страница 8: ...ure readings of probes S1 located on the solid fuel generator flow pipe S5 located on the heat exchanger return line and S4 located on the parallel water storage For probe S5 it is advisable to use th...

Страница 9: ...olid fuel generator flow pipe S5 located on the heat exchanger return line and S4 located on the parallel water storage For probe S5 it is advisable to use the following working set points 45 C for ra...

Страница 10: ...Sol1 on the solar collector and probe Sol2 on the lower section of the tank in tank water storage if higher than the set value solar circuit pump Psol is started Pump Psol continues to run for a selec...

Страница 11: ...rature difference T is checked between probe Sol1 on the solar collector and probe Sol2 on the lower section of the domestic water storage if higher than the set value solar circuit pump Psol is start...

Страница 12: ...the solar collector and probe Sol2 on the lower section of the direct inertial water storage if higher than the set value solar circuit pump Psol is started Pump Psol continues to run for a selectabl...

Отзывы: