background image

Commissioning

Upon completion of the installation, the valve should be tested and commissioned as per the 
procedure outlined below or as specified by the local authority.

The following instructions should be read and understood prior to commissioning the Caleffi 
SinkMixer thermostatic mixing valve. If, under any circumstances, there are aspects of the 
installation/system which do not comply with our requirements or the specifications as listed, the 
valve must not be put into service until the installation/system does comply.

1) Ensure that the system is throughly clean and free from debris prior to commissioning the 
  thermostatic mixing valve.
2) Use a suitably calibrated, accurate digital thermometer to commission temperatures by
  measuring the mixed water temperature at the outlet.
3) In accordance with the anti-scald requirements, water installation shall deliver hot water at 
  the outlet of the sanitary fixtures used primarily for personal hygiene purposes at a 
  temperature not exceeding 120°F (49°C) or as specified by authority having jurisdiction. 

 

4) The temperature at the outlet of each valve must be set taking into consideration any 
  fluctuations which may occur within the system due to simultaneous demand. 
5) Once the supply temperatures are stabilized and the normal operating conditions are 
  established, the valve can be commissioned. The temperature setting can be adjusted by with
  the black plastic adjustment 1/4” hex key, included separately in the box. 
  Break off from the mounting bracket.  Use the following sequence when commissioning the
 valve.

a)  Using a thermometer, measure the temperature of the sink faucet discharge with the
 

hot tap open, cold tap closed. The temperature should not exceed the temperature

 

allowed by the applicable standard or code of practice for each state.

b)   Adjust mixing valve to desired faucet discharge temperature, with provided 1/4” hex
 key.
c)  Perform the thermal shut-off test. Isolate the cold water supply to the Caleffi valve 
 

and monitor the mixed water temperature. The outlet flow should quickly cease 

 flowing.
d)   Restore the cold water supply to the valve and measure and record the outlet  
 

temperature after the mixed water temperature has stabilized. The final temperature 

 

found during this test should not exceed the permitted values ±3°F.

6) Once the desired temperature has been reached, remove the adjustment key and store in a
  safe place that can be located if required in the future.

We recommend that the above information is recorded in the Commissioning Report and updated 
on the Service Report when any work is performed on the valve.

9

Содержание 521201AP

Страница 1: ...um flow rate for optimum operation 2 3 gpm 8 5 l min Certifications 1 ASSE 1070 CSA B125 3 2012 certified by ICC ES file PMG 1358 2 NSF ANSI 372 2011 Drinking Water Systems Components Lead Content Red...

Страница 2: ...t such temperatures do not endanger people Leave this manual for the user SAFETY INSTRUCTION This safety alert symbol will be used in this manual to draw attention to safety related instructions When...

Страница 3: ...tpasinstall mis en service et entretenu correctement selon les instructions contenues dans ce manuel il peut ne pas fonctionner correctement et peut mettre en danger l utilisateur ATTENTION S assurer...

Страница 4: ...water in such a way as to maintain constant set temperature of the mixed water at the outlet A thermostatic element is fully immersed into the mixed water This element then contracts or expands causin...

Страница 5: ...and under counter applications in accordance with installation rules and indications specified in ASSE 1070 standards The system must be sized taking into account the current legislation with regard...

Страница 6: ...ked at any need Hand changes are forbidden Questodocumentonon daritenersiimpegnativo Ciriserviamoildirittodimodificareinostriprodotti diapportaremiglioramentitecniciedisvilupparliulteriormente Attenzi...

Страница 7: ...or associated fittings It is essential that when the installation is designed and or installed all current legislation is noted e g the maximum distance from the outlet of the valve to any terminal fi...

Страница 8: ...Installation diagram COLD HOT 8 Point of use 521201A 521201AP...

Страница 9: ...to simultaneous demand 5 Once the supply temperatures are stabilized and the normal operating conditions are established the valve can be commissioned The temperature setting can be adjusted by with...

Страница 10: ...D C O L D H O T M I X Remove 1 4 hex key from mounting bracket Remove white cap Adjust temperature setting with 1 4 hex key After adjustment lock the temperature with locking nut Replace cap and store...

Страница 11: ...e following steps are checked to maintain optimum valve performance Use the folllowing recommended procedure 1 On the Caleffi SinkMixer valves the inlet strainers on both the hot and cold water inlet...

Страница 12: ...Starvation of the water supplies at the valve inlets c Incorrect commissioning of the valve Restore inlet conditions within the limits of the valve Erratic flow of water from the valve a Insufficient...

Отзывы: