Operating Instructions
Uniprep 1 + 2 Rotary Scraping Tools
04
03. Operation
Operation
03.
2
3
4
9
5
7
8
10
6
1
Instructions for use
1. Ensure that the pipe end is cut square (No more than 2° out of
square), is free of burrs and the section to be scraped does not have
any deep scores.
2. Mark the pipe outer wall at a point 50% of the length of the coupler
plus 10mm.
3. Release the tool post cartridge by loosening the tool post
adjustment nut (5), position the tool post cartridge (3) to its highest
position and temporarily retighten (5).
4. Lower the underarm (8) by unscrewing the wing nut (11) which will
allow you to push underarm (8) forward against the spring allowing
you to lower the arm (8) down the ladder rack (1).
11