background image

Page 13

A

DDITIONAL PRODUCTS AVAILABLE FROM YOU

C

ALDERA

®

D

EALER

Monarch

® 

CD Ozone Generator

Monarch Silver Ion Purifier Cartridge

Monarch MPS non-chlorine oxidizer

Monarch MPS test strips

Retractable cover system with clearance requirements
• ProLift

®

- 14” Clearance Required

• ProLift II - 24” Clearance Required

Vinyl covers

Spa upgrade jet kits

Replacement Filter Cartridges

Pillows

Содержание Utopia

Страница 1: ...___________________________________________________ DEALER ____________________________________________________________________________________ ADDRESS ________________________________________________...

Страница 2: ...ATION Be aware of some special requirements if you place your spa indoors Water will accumulate around the spa so flooring materials must provide a good grip when wet Proper drainage is essential to p...

Страница 3: ...dency to settle unevenly resulting in an unlevel spa Remember placing the spa on grass or dirt may increase the amount of debris which is inadvertently brought into the spa water on the user s feet If...

Страница 4: ...sured operator For a charge the crane operator will lift your spa over walls buildings or any other obstruction and place it as close to the installation site as possible The Caldera spa delivery pers...

Страница 5: ...einforced concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Geneva and Niagara must not be shimmed in any manner Geneva and Niaga...

Страница 6: ...before making critical design or pathway decisions NOTE Watkins Manufacturing Corporation recommends that the Tahitian Aspire and Hawaiian be installed on a minimum 4 thick reinforced concrete pad or...

Страница 7: ...d concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Elation must not be shimmed in any manner Elation Aquatic Melodies model only...

Страница 8: ...a before making critical design or pathway decisions NOTE Watkins Manufacturing Corporation requires that the Moorea be installed on a minimum 4 thick reinforced concrete pad or structurally sound dec...

Страница 9: ...ritical design or pathway decisions NOTE Watkins Manufacturing Corporation recommends that the Martinique be installed on a minimum 4 thick reinforced concrete pad or structurally sound deck able to s...

Страница 10: ...m 4 thick reinforced concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Kauai must not be shimmed in any manner Kauai Paradise mod...

Страница 11: ...vice panel to the subpanel The equipment pack requires a MINIMUM of 112 volts per line under load The grounding conductor must be at least 10 AWG Your electrician should mount the subpanel in the vici...

Страница 12: ...hat the exterior fiber optic light cable will fit into the fixture Slightly pull on door or panel if door remains against the spa then replace the screws If the door does not lock into position repeat...

Страница 13: ...tor MonarchSilver Ion Purifier Cartridge MonarchMPS non chlorine oxidizer Monarch MPS test strips Retractable cover system with clearance requirements ProLift 14 Clearance Required ProLift II 24 Clear...

Страница 14: ...Pre Delivery Instructions Page 14 NOTES...

Страница 15: ...Page 15 NOTES...

Страница 16: ...cted circuit 7 0 x 7 0 213cm x 213cm AspireTM 36 91cm 100 sq ft 10 sq m 380 gallons 1 438 l 800 lbs 363 kg 5 180 lbs 2 350 kg 105 lbs sq ft 540 kg m 230 volt 30 or 50 amp Single phase GFCI protected c...

Отзывы: