background image

Pre-Delivery Instructions

Page 12

P

OWER

C

ONNECTION

To connect power to the spa, refer to “230 VOLT WIRING SCHEMATIC DIAGRAM” and “POWER
CONNECTION ACCESS” illustrations on page 11   , then proceed with the following steps: 

When supplying power, remove the screws securing the equipment door (for Utopia and Aquatic Melodies

®

spas, always

remove the SpaGlo

®

exterior light fixtures and lift the fiber optic cable out of the fixture base before removing the doors).

Lower the panel one inch and remove the panel to allow access to the input power wiring.  

NOTE:

The 230V wiring diagram is located on the inside of the Control Box Cover.

IMPORTANT:

The following must be followed to properly install the equipment compartment door.

• Place top of door or panel directly below bartop against the frame of the spa. For Utopia and Aquatic Melodies spas, first

lift the fiber optic cable out of the way.

• Push bottom of door or panel against the spa frame.

• Slide door or panel upward (pushing in on center of door to ensure door clips catch) until screw holes line up, making

sure that the exterior fiber optic light cable will fit into the fixture.

• Slightly pull on door or panel, if door remains against the spa then replace the screws.

• If the door does not lock into position, repeat the previous steps.

S

ERVICES

A

VAILABLE

F

ROM

Y

OUR

C

ALDERA

®

S

PA

D

EALER

Service Cost

Pre-Delivery site inspection

______________

Deliver spa to installation site

______________

Unwrap spa and haul away packaging material

______________

Set up spa

______________

Fill the spa with water

______________

Explain and test the spa’s operation

Lighting      • Sound system (Aquatic Melodies

®

spas only)

• Set temperature control 

• Control panel functions          • Auxiliary panel functions (Utopia  and Aquatic Melodies

® 

spas only)

Explain the safety features    

• GFCI

• Heater high limit

General spa operation & maintenance orientation

______________

Water quality and maintenance orientation

______________

Adjust the water’s  pH, Total Alkalinity and Calcium Hardness 

______________

Sanitize the water

______________

Inspect the spa cover, place on spa, and install cover locks

______________

Review winterizing instructions

______________

Review Owner’s Manual & Warranty Card

______________

Follow-up call

______________

In-store spa water analysis

______________

TOTAL COST

______________

Содержание Utopia

Страница 1: ...___________________________________________________ DEALER ____________________________________________________________________________________ ADDRESS ________________________________________________...

Страница 2: ...ATION Be aware of some special requirements if you place your spa indoors Water will accumulate around the spa so flooring materials must provide a good grip when wet Proper drainage is essential to p...

Страница 3: ...dency to settle unevenly resulting in an unlevel spa Remember placing the spa on grass or dirt may increase the amount of debris which is inadvertently brought into the spa water on the user s feet If...

Страница 4: ...sured operator For a charge the crane operator will lift your spa over walls buildings or any other obstruction and place it as close to the installation site as possible The Caldera spa delivery pers...

Страница 5: ...einforced concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Geneva and Niagara must not be shimmed in any manner Geneva and Niaga...

Страница 6: ...before making critical design or pathway decisions NOTE Watkins Manufacturing Corporation recommends that the Tahitian Aspire and Hawaiian be installed on a minimum 4 thick reinforced concrete pad or...

Страница 7: ...d concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Elation must not be shimmed in any manner Elation Aquatic Melodies model only...

Страница 8: ...a before making critical design or pathway decisions NOTE Watkins Manufacturing Corporation requires that the Moorea be installed on a minimum 4 thick reinforced concrete pad or structurally sound dec...

Страница 9: ...ritical design or pathway decisions NOTE Watkins Manufacturing Corporation recommends that the Martinique be installed on a minimum 4 thick reinforced concrete pad or structurally sound deck able to s...

Страница 10: ...m 4 thick reinforced concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart WARNING The Kauai must not be shimmed in any manner Kauai Paradise mod...

Страница 11: ...vice panel to the subpanel The equipment pack requires a MINIMUM of 112 volts per line under load The grounding conductor must be at least 10 AWG Your electrician should mount the subpanel in the vici...

Страница 12: ...hat the exterior fiber optic light cable will fit into the fixture Slightly pull on door or panel if door remains against the spa then replace the screws If the door does not lock into position repeat...

Страница 13: ...tor MonarchSilver Ion Purifier Cartridge MonarchMPS non chlorine oxidizer Monarch MPS test strips Retractable cover system with clearance requirements ProLift 14 Clearance Required ProLift II 24 Clear...

Страница 14: ...Pre Delivery Instructions Page 14 NOTES...

Страница 15: ...Page 15 NOTES...

Страница 16: ...cted circuit 7 0 x 7 0 213cm x 213cm AspireTM 36 91cm 100 sq ft 10 sq m 380 gallons 1 438 l 800 lbs 363 kg 5 180 lbs 2 350 kg 105 lbs sq ft 540 kg m 230 volt 30 or 50 amp Single phase GFCI protected c...

Отзывы: