background image

Page 4

Pre-Delivery Instructions

How is your width and height clearance?

Protruding electric meters

A/C units

Do you have sufficient
overhead clearance?

Check low roof eaves,
overhanging branches,
rain gutters

Is the path clear?

Move away branches, dog
houses, firewood, etc.

If there is a 90  turn, can we
clear it? (The spa will not bend)

No more than 6 consecutive
stairs without a landing
to accommodate the spa

Gas meters

Check all gates

HOUSE

BACK YARD

STREET

NOTE: 

It may be necessary to allow for additional over-head clearance if the spa will be rolled up or down an incline 

or moved up or down a short flight of stairs.
Use the information below to determine the requirements for 

access to your desired location.  It may be necessary to remove a 

gate, part of a fence, or other movable obstructions in order to roll 

the spa to its installation site. About ten percent of the time, a crane 

is the only way to install the spa by lifting it to its final destination. 
If the spa has to be taken off of the cart to go over a wall (either 

because the entry area is too narrow, the eaves are too low, the 

corner is too tight, or the stairway is too steep), a crane will be 

required. Don’t be alarmed!
The crane has a truck-mounted boom which can fit right in your 

driveway. It is run by a licensed and insured operator. For a 

charge, the crane operator will lift your spa over walls, buildings, or 

any other obstruction and place it as close to the installation site as 

possible. The 

CALDERA

 spa delivery personnel will supervise the 

crane delivery and complete the spa placement.  

NOTE: 

If your spa delivery requires the use of a crane, you may be required to pay for its services at the completion 

of the delivery.

Model

Width W

Length L

Height H

Palatino® 

38.5"

89"

89"

Marino

 

® 

36"

84"

84"

Vanto®

36"

84"

84"

Tarino™

33"

82"

82"

Aventine

 

®

29"

64"

64"

Содержание Vacanza Series

Страница 1: ...___________________________________________________ DEALER ____________________________________________________________________________ ADDRESS ________________________________________________________...

Страница 2: ...ovide a good grip when wet Proper drainage is essential to prevent a build up of water around the spa When building a new room for the spa it is recommended that a floor drain be installed The humidit...

Страница 3: ...n unlevel spa Remember placing the spa on grass or dirt may increase the amount of debris which is inadvertently brought into the spa water on the user s feet If you are purchasing a deck package or g...

Страница 4: ...to roll the spa to its installation site About ten percent of the time a crane is the only way to install the spa by lifting it to its final destination If the spa has to be taken off of the cart to...

Страница 5: ...structurally sound deck able to support the dead weight found in the spa specification chart IMPORTANT The PALATINO must not be shimmed in any manner PALATINO NOTE All dimensions are approximate measu...

Страница 6: ...concrete pad or structurally sound deck able to support the dead weight found in the spa specification chart IMPORTANT The MARINO VANTO must not be shimmed in any manner MARINO VANTO NOTE All dimensi...

Страница 7: ...r structurally sound deck able to support the dead weight found in the spa specification chart IMPORTANT The TARINO must not be shimmed in any manner TARINO NOTE All dimensions are approximate measure...

Страница 8: ...n or pathway decisions NOTE WATKINS WELLNESS recommends that the AVENTINE be installed on a minimum 4 10 cm thick reinforced concrete pad or structurally sound deck able to support the dead weight fou...

Страница 9: ...if an electrical outlet with a cover is required for your installation If it is a suitable outlet cover may be purchased from your authorized CALDERA dealer 115 Volt Electrical Requirements The TARIN...

Страница 10: ...ACK L1 8 AWG GREEN GROUND 8 AWG WHITE NEUTRAL 50A WITHIN SIGHT OF THE SPA THE SUB PANEL MUST BE MORE THAN 5 FEET DO NOT EXCEED 50 FEET WITH GFCI BREAKERS 50A SUB PANEL L2 GRD L2 HOT 8AWGRED L1 HOT 8AW...

Страница 11: ...wire electrical service two line voltages one neutral one ground from the main electrical service panel to the subpanel The grounding conductor must be at least 8 AWG Your electrician should mount th...

Страница 12: ...ater high limit General spa operation maintenance orientation ______________ Inspect the spa cover place on spa and install cover locks ______________ Review winterizing instructions ______________ Re...

Страница 13: ...Page 13 NOTES...

Страница 14: ...Pre Delivery Instructions NOTES Page 14...

Страница 15: ...NOTES Page 15...

Страница 16: ...105 lbs per square foot 115 volt 20 amp Dedicated GFCI protected cord or 230 volt 50 amp Single phase GFCI circuit F o o t p r i n t d i m e n s i o n s H e i g h t E f f e c t i v e fi l t e r a r e...

Отзывы: