 1. Basic Inroduction

Product User Manual

6

7

3)  For the automotive module or portable module application, appropriate measures 

of shock absorbing shall be taken.

4)  Leave enough adequate space above the battery module inner the battery box ,to 

connect the battery management system harness line,  also for better heat 
dissipation.

5)  When batteries are integrated into group, insulated protective measures shall be 

taken; 

6)  When the communication system is installed, it should be checked whether the 

feeder line connected to the grid is flow in advance, including each node, the 
socket connection, in order to avoid the open or short circuit faults.

2.5 Battery Connection Requirements

Electrical connection should comply with the relevant national electrical installation 

practices.

1)  Be careful when connecting the batteries, do pay attention to safety of high 

voltage to avoid battery short circuit;

2)  Quick connectors shall be set between battery modules, higher protectionlevel of 

power cord, plug and socket connectors and charging plugs and sockets shall be 
chose.

3)  When connecting the battery management system with batteries, copper and 

aluminum terminal surface of the battery shall be sanded (180 to 240 mesh is 
recommended for sanding, nickel terminal pole is prohibited to sand) to remove 
the oxide layer, thus reducing the contact resistance. If the copper bus bar surface 
is not processed, the contact surface of bus bar and connectors should be 
polished.

4)  Battery pole bolts must be tightened so as to avoid increasing contact resistance 

caused by poor contact. As the positive pole of battery is made by aluminum 
material, avoid excessive force when tightening the pole bolt to avoid screw 
thread slipping. For tightening torque

 please refer to content 2.6;

5) Make sure the welding and crimping of BMS acquisition line for voltage terminals, 

and connection of wiring harness reliable, avoid affecting voltage signal sampling 
accuracy due to poor contact. Insulating bush covering the terminals should not 
be too long so as to wrap the terminals.

6) The voltage acquisition line length should be appropriate. If the voltage acquisition 

line is too long, voltage on it will drop excessively

which can bring large error for 

voltage measurement.

Battery terminal pole sanding

Bus bar sanding

2.6 Operation tools

1)  During the process of battery connection, insulating gloves must be worn.
2)  The socket wrench, fixed wrench and screwdriver and other tools used for opera-

tion must be gone through rigorously insulating treatment. The operators are 
prohibited to carry metal items such as key chains, watches, necklaces and so on;

3)  When the terminal voltage of the connected grouping products is greater than 

24V, insulating gloves which can withstand voltage higher than the voltage of the 
entire group of connected systems shall be worn.

4)  When tightening the bolts, it is recommend using adjustable torque wrench in 

5-30N•m range, the recommended tightening torque values corresponding to 
specified bolts is shown in the following table.

2.7 Power system maintenance period and measures

1)  In a routine systematic check and detailed record on the power system usage, as well as the work of BMS and charger, detect 

hidden dangers and solve problems in time.

2)  Regularly check the connecting bolts fuses, contactors and fuses, as well as the degree of tightening for all the bolts connecting 

the battery poles.

3)  Regular inspect the connection reliability of all power connectors and electrical connectors, and check the insulation of the 

electric circuit and connection of cables and busbars.

4)  Check the battery voltage and current differences between BMS detected and data actually measured, and check BMS signal 

acquisition accuracy and check whether the SOC calculation precision calibration is required;

5)  Check the consistency of the whole set of batteries. If static or dynamic voltage difference of the battery is too large, please 

operate as troubleshooting steps.

2.8 Common troubleshooting methods for power system 

Tools insulating treatment

Insulating gloves

No.

1

2

3

4

Terminal bolt specification

M5

M6

M8

M14

recommended tightening torque

N·m

10

12

14

24

Note: Data shown on the table are manual measurement experience; If you 

purchase by yourselves, we recommend bolt material A2-70; Tightening 
torque can be referred to the recommended values corresponding to the 
thread diameter above.

CALB USA INC.

No.

1

2

3

4

5

Common Fault

Failure Cause

Approach

Note: 1. The examination and treatment for the power system should be based on system technology agreement; 
 

2. The examination for the power system requires trained personnel, and pay attention to the safety protection against high 

voltage and devices wounding during examination ; 

 

3 .If they can not determine the cause of failure, contact our after-sales personnel promptly.

Voltage acquisition failure (BMS software problems, poor 

socket contact, acquisition line connection error, loose 

connections of battery terminals, etc.)

Temperature acquisition abnormal

acquisition device 

damage, bad connectors, pole connections loose)

Thermal management system abnormal (fan or heating 

device does not start, duct blockage, etc.)

Battery itself reason(terminal severe oxidation, internal 

reasons)

Abuse like over charge, over discharge; environmental 

reasons like high temperature, high humidity, ultra low 

pressure

upside down and other external cause

tightening torque is too large, tightening operation not 

standard

Battery fault

State of charge is inconsistent, internal 

reasons

Abnormal voltage

Abnormal temperature

Battery bulging

Battery leakage

Terminal slippery

1. Investigating the fault and eliminated;

2. If the fault does not exist, it may be 

the batteries fault.

Investigation of the cause of the fault 

and eliminate

Check the thermal management system

repair or replace

Troubleshooting and contact after sales

Troubleshooting and contact after sales

Troubleshooting and replace

repair or replace

Содержание CAM72

Страница 1: ...IZ YKX 3GT GR NOTG OGZOUT 2OZNO S GZZKX_ U 2ZJ CALB Headquarter No 66 North Binhe Road High Tech Zone Luoyang Henan China 471003 Tel 86 0379 6069 7962 Fax 86 0379 6069 7995 http www calb cn http en ca...

Страница 2: ...GTJ VXUJ IZOUT GTJ IKXZOLOIGZOUTY ZU KTZKX OTZU OTZKXTGZOUTGR SGXQKZY OTIR JOTM 8U 9 GTJ 4 ZXGTYVUXZGZOUT IKXZOLOIGZOUT 2 GTJ VXUJ IZY NG K NOMN XKV ZG ZOUT GTJ OTLR KTIK OT NUSK GTJ GHXUGJ SGXQKZY K...

Страница 3: ...hown in the diagram the lithium ions shuttle between the positive and negative back and forth during charging and discharging process so the lithium ion batteries are also known as rocking chair batte...

Страница 4: ...ited for long time use to avoid overcharging or over discharging During battery use we recommend charging and discharging range between 10 90 DOD according to the principle of low depth of charge and...

Страница 5: ...commend using adjustable torque wrench in 5 30N m range the recommended tightening torque values corresponding to specified bolts is shown in the following table 2 7 Power system maintenance period an...

Страница 6: ...ear customers we present our CALB characteristic after sales service system as core competitiveness Our service brand is Customer satisfaction Service never stop Goal customer satisfaction scheme sati...

Страница 7: ...ment main performance parameters failure analysis and troubleshooting equipment on site operation and maintenance equipment installation operation maintenance and others 6HUYLFH EH RQG ZDUUDQW Service...

Отзывы: