I.

 

AT DELIVERY 

I.1.

 

Checkings at delivery 

When the equipment is received, the state of the packaging and the equipment must be checked. In the event of damage, make an accurate note of 
any problems on the carrier's delivery note. 

I.2.

 

Unpacking 

When the equipment is unpacked, check the following: 
- The total number of packages are present. 
- All accessories are present (dampers, roof, electric switchgear, etc.). After unpacking the equipment, the waste must be disposed of in compliance 
with the current standards. No packaging should be discarded into the environment 

 

 

I.3.

 

Storage 

 

The equipment must be stored in shade, in a dry place, at a temperature between -20°C and 40°C. 
 

II.

 

INSTALLATION 

II.1.

 

Handling 

 

The units must only be moved in their installation position. 

If the device is handled using a fork-lift truck, ensure this supports the load-bearing structure and does not touch the panels enclosing the unit. 

If the device is moved using a crane, use four cables of identical lengths. These must be at least as long as the greatest distance between two 
fastening points. 
If dimensions L + W + H > 5m Þ then the case must be lifted using a lifting beam. 

 

In compliance with the current norms, the machine should be installed only by a technical person qualified 
for this type of work. During installation, ensure that:

 

  

 

- The machine is moved as given in chapter II.1.

 

  

 

-  The  required  personal  protection  devices  are  worn  so  as  to  avoid  injuries  caused  by  electrical 

and mechanical hazards (injuries by touching panels, sharp edges, etc.)

 

  

 

- Electrical connections are made after the power supply has been shut off, in compliance with the 

recommendations given in chapter III.

 

  

 

- Grounding is carried out in compliance with current standards.

 

  

 

- The machine is powered on when installation has finished (ducting installed and inspection doors 

closed).

 

 

 

 

 

Содержание PYROSTAR F400-120

Страница 1: ...PYROSTAR SMOKE FAN F400 120 MS MTG 001 Ind E 01 10 2019 Page 1 8 INSTALLATION AND COMMISSIONING MANUAL...

Страница 2: ...I 1 Handling 3 II 2 Space required for maintenance 4 II 3 II 3 Installation 4 III ELECTRICAL WIRING 4 III 1 Wiring 4 III 2 1 speed motors 4 III 3 III 3 2 speeds motors 5 III 4 III 4 2 speeds motors se...

Страница 3: ...handled using a fork lift truck ensure this supports the load bearing structure and does not touch the panels enclosing the unit If the device is moved using a crane use four cables of identical lengt...

Страница 4: ...outdoor or when installed indoor separated from other volumes by a 1 hour fire resistant wall The door of the technical room should be hour fire resistant Ventilation of this technical room should com...

Страница 5: ...4 III 4 2 speeds motors separate windings 2 speeds 1 voltage separate windings 400 V 4 6 poles motors Low speed High speed Once wiring is done check if the impeller is turning in the right direction I...

Страница 6: ...eck pulleys alignment both motor and impeller pulleys along with belt tension IV 2 IV 2 Belt tension Please refer to the following table for belt s tension I pulleys axle spacing F belt deflection P f...

Страница 7: ...rflow After settings make sure both locking screws are secured and the the pulleys alignment is fine V Troubleshooting Problem Main reasons How to solve Fan not running Main power off Thermal motor pr...

Страница 8: ...PYROSTAR SMOKE FAN F400 120 MS MTG 001 Ind E 01 10 2019 Page 8 8 VI NOTES Date Observations...