ED-TOUCH
TOUCH SCREEN REMOTE CONTROLLER
OPERATING AND COMMISSIONING INSTRUCTIONS
MS-REL-001
Ind B
Maj. 20/06/2017
Créé par : JC
Validé par : AR
Page 2/8
TABLE DES MATIERES
I.
RECEIVING THE EQUIPMENT ................................................................................................................. 2
I.1.
Checks on reception ...................................................................................................................... 2
I.2.
Unpacking ...................................................................................................................................... 3
I.3.
Storing ............................................................................................................................................ 3
II.
INSTALLATION ........................................................................................................................................ 3
II.1.
INSTALLATION ................................................................................................................................ 3
II.2.
Wiring ............................................................................................................................................. 3
II.2.a.
CARMA ................................................................................................................................... 3
II.2.b.
AQUAPACK – ELECTROPACK – NEOTIME – EVENTYS - FREETIME ......................................... 3
II.2.c.
EXAECO .................................................................................................................................. 4
II.3.
Activation ....................................................................................................................................... 4
III.
GENERAL OPERATION ........................................................................................................................ 5
III.1.
Centrale operating : menu tree ..................................................................................................... 5
III.1.a.
Écran 1 : Home scrren AHU in running opration ................................................................... 5
III.1.b.
Screen 2 : main menu ............................................................................................................ 6
III.1.c.
Screen 3 : Offset temperature ............................................................................................... 6
III.1.d.
Screen 4 : Extended operation .............................................................................................. 6
III.1.e.
Screen 5 : Information menu ................................................................................................. 7
III.1.f.
Écran 6 : Setting menu ........................................................................................................... 7
III.2.
Unit stopped without alarm : menu Tree ...................................................................................... 7
III.3.
Unit stopped due to a default : menu Tree ................................................................................... 8
IV.
Use EDTOUCH as room setpoint ........................................................................................................ 8
V.
Repair ..................................................................................................................................................... 8
I. RECEIVING THE EQUIPMENT
I.1. Checks on reception
When the equipment is received, the state of the packaging and the equipment must be checked. In the event of damage, make
an accurate note of any problems on the carrier's
delivery note
SAFETY INSTRUCTIONS
In compliance with the current norms, the machine should be installed only by a technical person qualified for this type
of work.
Use the required personal protection devices so as to avoid injuries caused by electrical and mechanical hazards (injuries
by touching panels, sharp edges, etc.). Use EN170 protective eyewear and ear protection.
Do not use the unit for an other used which it designed. This unit can’t be use for extract or supply dangerous air.
Move the machine as given in chapter handling.
Grounding is carried out in compliance with current standards. Never start the device without grounding
Before any intervention ensure that device is powered off and wait for complete stop of every rotative component such as
damper, fan, rotative exchanger…
During device is running inspection doors must be mounted and closed.
Start is to be done only with padlockable swith.
Do not shut off or short circuit the safety and control equipment.
During interventions, be carefull with hot components such as hot water coil or electric resistances.
The machine should be installed in compliance with fire norms.
The waste must be disposed of in compliance with the current standards. No packaging should be discarded into the
environment.
We disclaim any responsibility for any damages resulting from wrong utilisation of the equipment, reparation,
modification or non compliance of these instructions.