![Cairox UKUNDA Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/cairox/ukunda/ukunda_installation-operation-and-maintenance_3338597013.webp)
18/10/18 13
UKUNDA
SIG AH
Heat Recovery unit
Installation-Operation-Maintenance
reserves the right to change the specifications of the product at any time without prior notice
8 AVAILABLE ACCESSORIES AND CONTROLS
ACCESSORY
Detection and regulation
• CO
2
ambient probe (APC)
• CO
2
duct probe (DPC)
• VOC - volatile organic compound- ambient probe (APV)
• VOC - volatile organic compound- duct probe (DPV)
• Humidity ambient probe (APH)
• Humidity duct probe (DPH)
• Defrost system by flow imbalancing (DES)
• Bypass 100% (BPD)
• Electronically controlled electric pre heater (PEHD) (self contained)
• Electronically controlled pre hot water coil (PHWD) (self contained)
• Electronically controlled post hot water coil (HWD) (self contained)
• Electronically controlled chilled water coil (CWD) (self contained)
• Electronically controlled electric post heater (EHD) (self contained)
• Occupancy infra red sensor (IRS)
• Clogged filter alarm (pressure sensor) (DPS)
Control
• KTS control touch screen BASIC
• KTS control touch screen EXTRA
• Constant air flow operation (CAF)
Communication
• MODBUS module (MOD)
• MODBUS PROTOCOL CONVERTER (CVR)
• Network module for TCP/IP (NET)
• Radio frequence module (RFM)
CODE
■
◆
■
◆
■
◆
●
●
◆
◆
◆
◆
◆
●
●
■
■
■
◆
◆
◆
◆
A wide range of accessories is available. Ask for single technical sheet for further details.
■
outside the unit (option)
◆
inside the unit (option)
●
factory fitted as standard