Cairox SOLANO W-100 Скачать руководство пользователя страница 13

13 

 

 
- Before connecting the power supply check the correctness of connection of the fan motor and the 
ontrollers These connections should be executed in accordance with their technical documentation. 
- Before connecting the power supply check whether the mains voltage is in accordance with the voltage 
on the device data shield. 
- The electrical system supplying the fan motor should be additionally protected with a circuit breaker 
against the effects of a possible short-circuit in the system 
- Starting the device without connecting the ground conductor is forbidden.

 
- The connection should be executed in a way which does 
not induce stresses. It is recommended to use flex pipes to 
connect the stubs. 
- It is recommended to install vent valves at the highest point 
of the system. 
- The system should be executed so that, in the case of a 
failure, it is possible to disassemble the device. For this 
purpose it is best to use shut-off valves just by the device. 
- The system with the heating medium must be protected 
against an increase of the heating medium pressure above 
the permissible value (1.6 MPa). 
-  While screwing exchanger to pipeline - connecting stubs 
has to be hold by wrench. 

 
- The device is designed for operation inside buildings, at temperatures above 0

o

C. In low temperatures 

(below 0ºC) there is a danger of freezing of the medium.

 

- The manufacturer bears no responsibility for damage of the heat exchanger resulting from freezing of 
the medium in the exchanger. It is forbidden to place any objects on the heater or to hang any objects 
on the connecting stubs. 
- The device must be inspected periodically. In the case of incorrect operation of the device it should be 
switched off immediately. 
- It is forbidden to use a damaged device. The manufacturer bears no responsibility for damage 
resulting from the use of a damaged device. 
- If it is necessary to clean the exchanger, be careful not to damage the aluminium lamellas. 
-  For the time of performing inspection or cleaning the device, the electrical power supply should be 
disconnected. 
- In case water is drained from the device for a longer period of time, the exchanger tubes should be 
emptied with compressed air.

OPERATION

GUIDELINES FOR CONNECTION WITH PIPELINE

GUIDELINES FOR CONNECTION WITH POWER SUPPLY

Содержание SOLANO W-100

Страница 1: ...1 SOLANO DESIGN TECHNICAL DOCUMENTATION TECHNISCHE DOCUMENTATIE GEBRUIKSAANWIJZING NOTICE D UTILISATION DOKUMENTACJA TECHNICZNA MŰSZAKI LEÍRÁS ...

Страница 2: ...3 8 GUIDELINES FOR CONNECTION WITH PIPELINE 13 9 OPERATION 13 10 CLEANING AND CONSERVATION 14 11 HEATING CAPACITY 67 Air Curtain SOLANO DESIGN is dedicated to install over the door opening it provides dynamic barrier cutting out external environment from indoor SOLANO DESIGN types DESIGN W 100 curtain with water heat exchanger max range 5 m DESIGN N 100 without heat exchanger ambient max range 5 m...

Страница 3: ...00 E 200 230 50 3x400 50 230 50 3x400 50 230 50 3x400 50 0 36 0 4 7 5 0 46 0 48 11 5 0 53 0 54 15 5 1 7 1 9 11 2 1 2 2 16 6 2 3 2 4 22 4 IP Insulation class 21 F Connecting stub 1 2 1 2 1 2 Max water temperature O C 95 95 95 1 6 1 6 1 6 Temperature increase T ºC 14 10 16 11 17 11 Weight kg 25 8 24 28 0 32 9 30 7 34 9 39 2 36 3 41 9 Weight of unit filled with water kg 26 6 34 2 40 8 ...

Страница 4: ... DESIGN E 200 ATTENTION When installing the unit as in the figure above a space 10 mm recommended between the bracket and the casing of curtain should be ensured contact between the bracket and the casing is forbidden It is recommended to level the unit so that all of the screws were equally burdened by the curtain In case of installation under the ceiling 4 pcs of M8 rods should be screwed into t...

Страница 5: ...ch bracket to the wall by two screws min M8 Installation of each bracket on the unit should also be performed using the supplied M8 rods as indicated in the figure below Type of curtain Distance mm DESIGN W 100 DESIGN E 100 DESIGN N 100 851 DESIGN W 150 DESIGN E 150 DESIGN N 150 1287 DESIGN W 200 DESIGN E 200 DESIGN N 200 1701 STAGES OF INSTALLATION BRACKETS ...

Страница 6: ...ange 5 35o C Operating temperature range 10 60o C IP Insulation class IP30 Power supply 24VDC S V 2 1 2 two way 1 2 valve with actuator IP Insulation class IP20 Power supply 200 240V 50 60Hz Max water temperature 93o C Max water pressure 2 1MPa Kvs 3 0 m3 h Opening time 18 s S V 3 1 2 three way 1 2 valve with actuator IP Insulation class IP20 Power supply 200 240V 50 60Hz Max water temperature 93o...

Страница 7: ... to the SOLANO DESIGN curtain the front panel must be opened by unscrewing the screws located in the upper parts of the unit Power and control wires must be routed through rubber passages located in the upper part of the air curtian CONNECTING GUIDE ...

Страница 8: ...mostat signal HEAT heating mode FAN room thermostat deactivated COOL cooling mode Œ Power supply 3x400V 50Hz DESIGN E 100 5x2 5 mm DESIGN E 150 5x2 5 mm DESIGN E 200 5x4 0 mm Max diameter of power supply wire 6 0 mm2 Ž Door contact S DS RMAG S DS MEC door closed opened contacts door opened closed contats Use DC jumper between connectors NC and NC if door contact not used OMY 2x1 0 mm2 Air curtain ...

Страница 9: ... supply B Return pipe water supply Ž Door contact S DS RMAG S DS MEC door closed opened contacts door opened closed contats Use DC jumper between connectors NC and 1 if door contact not used Air curtain step switch with thermostat S C OMY 5x1 0 mm2 FAN AUTO fan operating depending on room thermostat signal FAN CONT fan operating continously deactivated thermostat signal HEAT heating mode FAN room ...

Страница 10: ... connection S TOUCH connectors MASTER SLAVE connectors PT 1000 connectors LED INDICATORS G1 G2 G3 signalize number of fan speed operating S1 S2 S3 signalize number of set fan speed T signalize of valve set DC signalize of door contact set OPEN CLOSE signalize valve actuator WORK signalize of software working SW3 operating mode switch default settings SOLANO DESIGN CONTROL SYSTEM ...

Страница 11: ...Operating w o thermostat Werking zonder thermostaat Travail sans thermostat chauff age forcé Praca bez termostatu wymuszenie grzania termosztát nélküli K1 programme Signal from door switch or thermostat is main signal for the device to run K2 programme Signal from door switch is main signal for the device to run and thermostat is in charge of valve heaters Œ Power supply 230V 50Hz OMY 3x1mm2 S TOU...

Страница 12: ...ened contacts closed OMY 2x0 5mm2 EASY E ATTENTION Switch 4 on SW3 to the position E and then restart the system switching it off for 5 seconds Each time the device is switched off the heaters are being cooled for next 30 seconds Sample of door contact installation S DS MEC in cafe of installation in way which is show on drawing below connectors 21 and 22 need to be used DOOR CONTACT INSTALLATION ...

Страница 13: ... of the heating medium pressure above the permissible value 1 6 MPa While screwing exchanger to pipeline connecting stubs has to be hold by wrench The device is designed for operation inside buildings at temperatures above 0oC In low temperatures below 0ºC there is a danger of freezing of the medium The manufacturer bears no responsibility for damage of the heat exchanger resulting from freezing o...

Страница 14: ...and the adverse impact on fan operation causes waving If cleaning of heat exchanger is needed use listed guidelines Disconnect power supply of unit Dismount inlet grill guard It is recommended to use pressured air to clean the exchanger air stream need to be directed perpendicular to exchanger and moved along lamellas Other installed equipment do not need be cleaned CLEANING AND CONSERVATION ...

Отзывы: