background image

they will all contact with the surface 

2.7 Assembly and/or Repair of 

Spare Parts

Take in to account the national regulations 

for inspections, maintanence and repair of 

the working towers. 

The spare parts provided by Çağsan Mer-

diven  should  be  assembled  on  the  right 

product and in the same way as the rep-

laced part.

If assembly (connection) and/or repairs 

are performed by the customer, risk and 

expenses shall belong to the customer. 

Çağsan Merdiven shall not be responsib-

le for damages resulting from wrong as-

sembly and/or repair.

Çağsan  Merdiven  may  provide  services 

for the repair of your product and/or as-

sembly of the said part with payment

2.8 Guarantee Conditions

Related Çağsan Merdiven product is de-

signed, manufactured carefully and its 

necessary quality controls are performed. 

If this product is used in compliance with 

this instruction and its usage purpose it 

shall be under the guarantee with the fol-

lowing conditions:

1.  Çağsan Merdiven guarantees the reli-

ability of the product and the quality 

of the materials used for the product.

2.  If there is a fault in production, the 

faulty part or the product is replaced 

under the guarantee scope and the 

problem is solved.

3.  The  faults  that  are  not  covered  with 

the guarantee are those stated below: 

a)   Usage of product in violation of 

usage purpose and usage instructions.  

b)    Normal wear and tear of the product. 

c)Assembly or repair performed by 

the customer or third parties (the rep-

lacement  of  spare  parts  provided  by 

Çağsan Merdiven as shown in the 2nd 

article above is excluded).

4.  The faults determined during product 

delivery  should  be  immediately  in-

formed to Çağsan Merdiven. If these 

faults are not immediately informed 

the guarantee shall be void. In order 

to make a request under the guarantee 

scope,  Çağsan  Merdiven  or  Çağsan 

Merdiven dealer should be informed 

about the product delivery and an in-

voice should be submitted.

5.  Product faults should be informed 

to Çağsan Merdiven or Çağsan Mer-

diven  dealer  as  soon  as  possible  but 

within 7 days after the determination 

of the fault at the latest.

6.  a) If a request is made under the gu-

arantee  conditions,  Çağsan  Merdi-

ven  product  shall  be  examined  by 

Quality Department. Customer ne-

eds to deliver the product to Çağsan 

Merdiven for this purpose. If during 

the examination it is determined 

that the product was inappropriately 

used, examination expenses shall 

be requested from the customer. 

b)  If customer requests the exami-

nation to be made by an indepen-

dent  organization  and  if  as  a  result 

of the examination it is determined 

that the product was used inapprop-

riately, examination expenses shall 

be covered by the customer. Even if 

Çağsan  Merdiven  requested  a  free 

repair or replacement of the product 

before the examination, the expenses 

shall belong to the customer again. 

2.9 Fastening of Frames

Fix the frames with locking pins. 

(Diagram 8 - 9) 

9

7

 

EN

8

9

Содержание ProTUBE L

Страница 1: ...1 EN Assembly and use guide PROFESSIONAL SCAFFOLDING SYSTEMS ProTUBE L S F The instructions for the assembly and use shall be followed carefully EN1004 201612 IE 1210...

Страница 2: ...1 ProTUBE L Configuration Table 9 3 2 ProTUBE L6 Scaffold Assembly Method 10 3 3 ProTUBE L Wide Aluminum Scaffold System 3D Pictures 16 17 3 4 ProTUBE L Scaffold System Compounds 18 4 ProTUBE S Narrow...

Страница 3: ...prevention of risks towards people or objects Safety me asures for weather conditions which may negatively affect security of the ProTUBE Scaffolds Permitted load Other risks to occur as a result of a...

Страница 4: ...affect the balance Diagram 2 The parts and tools on the working floor of ProTUBE Scaffolds can only be manually carried If ProTUBE Scaffolds are to be pla ced on a soft surface there should be protec...

Страница 5: ...following should be considered The product is suitable for usage with ProTUBE Scaffolds ProTUBE Scaffolds allows safe ope ration in the immediate vicinity of the assembly point ProTUBE Scaffolds can b...

Страница 6: ...ds 2 6 Relocation of ProTUBE Scaffolds The height must be decreased to maximum 6 meters in order to move ProTUBE Scaffolds Stabilizers should be lifted maximum 10 cm in order to move ProTUBE Scaffolds...

Страница 7: ...b Normalwearandtearoftheproduct c Assembly or repair performed by the customer or third parties the rep lacement of spare parts provided by a san Merdiven as shown in the 2nd article above is exclude...

Страница 8: ...rushing cracks and correct functioning of the fastening elements Platforms Check for warping crushing cracks and correct functioning of the fastening elements Check the condition of the wood Check the...

Страница 9: ...2 16 20 24 Guardrail Braces H PT259H 4 9 2 2 2 2 2 2 Horizontal Braces PT259Y 2 13 2 2 8 8 14 14 Stabilizer PT276PA 4 04 4 4 4 4 4 Castor PT200TE 5 5 4 4 4 4 4 4 Toeboard PT302TM 16 17 1 1 2 2 3 3 Tot...

Страница 10: ...izontal braces onto the 1st step and fasten it to the modular frame from the interior part Make sure the alu minum cast clamps on the corners of the connections are safely seated and locked Diagram 3...

Страница 11: ...ap between 6th step and 7th step Af ter making sure the tools completely grasp the carrier profile tighten the bakalite heads by turning Make sure each balance leg wedges are in conta ct with the soli...

Страница 12: ...Make sure the aluminum cast clamps are safely seated and locked Diag ram 9 8 Then place the platform without trap door in line with the 3rd step of the 2nd floor while you are on the 1st floor After t...

Страница 13: ...e 2nd floor Pass the security pint of the guardrail frames from the holes of the modular frames and lock them Diagram 11 10 Get on top of the platform with trap door on the 1st floor and carry the mod...

Страница 14: ...al security connections of the guardrail Make sure the aluminum cast clamps are sa fely seated and locked Diagram 13 12 Place the platform you assembled on top to the corner by getting into the lower...

Страница 15: ...iagram 16 You need to repeat the steps 6 7 8 in order to increase the height of your scaffold The height of the first platform should be maximum 4 60 m and the distance betwe en the platforms should b...

Страница 16: ...16 EN ProTUBE L4 2 3 m ProTUBE L6 4 4 m ProTUBE L8 6 5 m 3 3 ProTUBE L Wide Aluminum Scaffold System 3D Pictures...

Страница 17: ...17 EN ProTUBE L10 8 0 m ProTUBE L14 12 20 m ProTUBE L12 10 7 m 3 3 ProTUBE L Wide Aluminum Scaffold System 3D Pictures...

Страница 18: ...ar Frame 7 Steps PT275C Diagonal Braces PT258KP Platform With Trapdoor PT276PA Stabilizer PT263M Modular Frame 5 Steps PT259Y Horizontal Braces PT258K Platform Without Trapdoor PT110K Guardrail Frame...

Страница 19: ...rail Braces H PT259H 4 0 2 2 2 Horizontal Braces PT259Y 2 0 2 2 2 Stabilizer PT276PA 4 0 4 4 Castor PT200TE 5 5 4 4 4 Toeboard PTS302TM 11 0 1 1 2 Total Weight 102 3 145 1 206 4 60x240 cm Explanation...

Страница 20: ...rizontal braces onto the 1st step and fasten it to the modular frame from the interior part Make sure the alu minum cast clamps on the corners of the connections are safely seated and locked Drawing 3...

Страница 21: ...the solid surface Then place the 1 covered platform to the 7th step Balance the scaffold according to the long sides and short sides by using water scale Drawing 6 and 7 It is not mandatory to use ba...

Страница 22: ...re the aluminum cast clamps are safely seated and locked Drawing 9 7 Then carry it upwards onto the 7th step of the 2nd floor and fix it Don t forget to open the wind lock while di sassembling the pla...

Страница 23: ...tool of the mo dular frames of the 2nd floor Pass the security pint of the guardrail frames from the holes of the modular frames and lock them Drawing 11 9 Fix the horizontal security con nections of...

Страница 24: ...awing 14 You need to repeat the steps 5 6 7 in order to increase the height of your scaffold The height of the first platform should be maximum 4 60 m and the distance betwe en the platforms should be...

Страница 25: ...25 EN 4 3 ProTUBE S Narrow Aluminum Scaffold System 3D Ima ProTUBE S6 4 4 m ProTUBE S4 2 3 m ProTUBE S8 6 5 m...

Страница 26: ...Systems Compounds PTS223M Modular Frame 7 Steps PT275C Diagonal Braces PT258KP Platform With Trapdoor PT276PA Stabilizer PT259Y Horizontal Braces PTS110K Guardrail Frame PT259H Guardrail Braces H PT20...

Страница 27: ...l Braces H PTF182H 4 0 2 2 Horizontal Braces PTF182Y 2 0 1 1 Stabilizer PT276PA 4 0 4 Castor PT125TE 5 5 4 4 4 Toeboard PTF180TM 11 0 1 1 Total Weight 54 5 93 7 136 5 60x180 cm Explanation Item Code M...

Страница 28: ...put Take the module to the usable position by opening it outwar ds and lock it again Drawing 2 3 3 Place the 1 horizontal connection onto the 1st step and fasten it to the modu lar frame from the int...

Страница 29: ...en the short part of the balance legs to the gap between 1nd step and 2rd step and its long part to the gap between 6th step and 7th step After making sure the tools completely grasp the carrier profi...

Страница 30: ...orms After this your scaffold will rise for another flo or Drawing 9 9 Get on top of the platform you placed on the 2nd floor and put the guardrail frames into the fitting tool of the mo dular frames...

Страница 31: ...10 Fix the horizontal security connecti ons of the guardrail Make sure the aluminum cast clamps are safely sea ted and locked Drawing 11 10 11 31 EN...

Страница 32: ...ad in a way that it will surround the platform at the top Drawing 12 12 Your ProTUBE F360 coded product with 4 40 m stepping height is ready for usage Drawing 13 Thank you for choosing a san Merdiven...

Страница 33: ...33 EN 5 3 ProTUBE F Karelia Aluminum Scaffold System 3D Images ProTUBE F90 0 9 m ProTUBE F360 ProTUBE F180 3 6 m 1 8 m...

Страница 34: ...unds PTS223M Modular Frame 6 Steps PTS223ME Modular Frame 6 Steps PTF202C Diagonal Braces PTF183KP Platform With Trapdoor PT276PA Stabilizer PTF182Y Horizontal Braces PTS110K Guardrail Frame PTF182H G...

Страница 35: ......

Страница 36: ...of this document may not be used reproduced or copied without permission in printed form or in any other electronic media Cagsan Merdiven Erisim Ekipmanlar San Tic Ltd Sti Dilovas Organize Sanayi Bolg...

Отзывы: