TR-MAN-4500-A
Operator's Manual - 4000M 4500M
Page 17 of 46
Finishing an Application
Step 1
When you are nearing complete coverage of a section, signal the operator to shut
down the pump. Start the hose blow out procedure. Continue to move the applicator
through the field until flow to the applicator has stopped.
The hose is a high volume “Receiver Tank” containing a large amount
of fluid. Be sure to allow enough spreading area to properly apply the
hose content.
o
Ø 6” hose contains approximately 1 ½ US Gallons per foot
o
Ø 8” hose contains approximately 2
⅔
US Gallons per foot
660 1320 1980 2640 3300 3960
4620
5280
5940
6600
Feet
Ø 6" 969 1939 2908 3877 4847 5816
6785
7755
8724
9693
US Gal
Ø 8" 1723 3447 5170 6893 8616 10340 12063 13786 15509 17233
US Gal
Failure to compensate for the remaining fluid can result in over
application of fluid.
Step 2
Drag the hard hose so that it is back at the original start position. Disconnect the
applicator from the hard hose by uncoupling the ringlock fitting.
End
Position
CORRECT
INCORRECT
Figure 16 - Return to End Position
img-00125.wmf
Содержание 4000M
Страница 1: ...4000M 4500M Hard Hose Drag Reel OPERATOR S PARTS and MAINTENANCE MANUAL 2006 EDITION TR MAN 4500M...
Страница 2: ......
Страница 4: ...TR MAN 4500 A Operator s Manual 4000M 4500M Page 2 of 46...
Страница 22: ...TR MAN 4500 A Operator s Manual 4000M 4500M Page 20 of 46...
Страница 28: ...TR MAN 4500 A Operator s Manual 4000M 4500M Page 26 of 46 Drum Assembly 4000M 4500M A M N D A M D N A C A...
Страница 30: ...TR MAN 4500 A Operator s Manual 4000M 4500M Page 28 of 46 Drum Assembly 4000M 4500M A M N D A M D N A C A...
Страница 47: ...TR MAN 4500 A Operator s Manual 4000M 4500M Page 45 of 46...