TR-MAN-3NMB
Operator's Manual - 3NMB
Page 15 of 39
Cadman Power Equipment
▪
BOX 100, Courtland, Ontario, Canada N0J-1E0
▪
Phone: 519-688-2222
▪
Fax: 519-688-2100
▪
www.cadmanpower.com
img-00037
3. Cover the second half in a similar fashion,
using a zigzag pattern and working away from the reel.
img-00038
4. Finish covering the entire section. Signal the pump
operator when you are finished applying
Step 11
Start the hose blow out procedure. Keep moving the boom through the field until flow
to the nozzles has stopped.
OPERATOR NOTE
Where field conditions
permit, always attempt to
pull the hose up or down
sloping terrain instead of
operating across a side
hill.
Always turn away from the
reel. Failing to do this
could cause you to get
“trapped” by the drag
hose.
Be aware of obstacles in
the field. Application plans
need to take into account
any obstacles that could
get in the way of your
application.
Keeping your 3 Nozzle
Manure Boom clean will
dramatically increase its
life.
Cleaning the hoses, as
well as cleaning the
exterior of your 3 Nozzle
Manure Boom is highly
recommended after each
use.