background image

 

1-3

Installing the 9C500 Plus Power Box

 

5. Ensure the power supply wiring is routed away from sharp edges.

6. Power up the power supplies.

 

Installing the Power Box

 

Complete the installation of the first power box by following the steps below:

1. Remove the unit from the shipping box. (Save the shipping box and packing 

materials in the event the power box must be reshipped.)

2. Remove the unit from the plastic bag and check for damage. If any damage 

exists, DO NOT attach the unit. Contact Cabletron Systems Technical Support 
immediately.

3. Remove the accessory package.

4. Line up the four holes in the frame of the power box with four corresponding 

holes on the equipment rack (take care to properly align the holes).

5. Secure the power box to the equipment rack using four bolts shipped with the 

equipment rack.

 

Connecting Auxiliary Power Cord

 

There are two auxiliary power source connectors on the back of the SmartSwitch 
9000 Chassis. The power supply number that displays on the LCD of the 9C300-1 
Environmental Module (EM) and local or remote management screens is a 
function of the connection made from the power box to one of these connectors. 

If the connection is made to the right auxiliary power source connector 
(Figure 1-1), the power supply in the right side of the power box is number 3 and 
the power supply in the left side is number 4. 

If the connection is made to the left auxiliary power source connector (Figure 1-1), 
the power supply in the right side of the power box is number 5 and the power 
supply in the left side is number 6.

Using the auxiliary power cord, accessories supplied with the power box, and 
referring to Figure 1-1, connect the auxiliary power cord from the power box to 
the auxiliary power source connector on the back of the chassis by following the 
steps below:

If you are installing more than one power box in an equipment rack, to prevent 
tipping, the SmartSwitch 9000 Chassis should be moved to the bottom of the rack 
before installing the power boxes; or the rack should be secured to the floor.

NOTE

Содержание 9C500 Plus

Страница 1: ...9031344 02 SmartSwitch 9000 9C500 Plus Power Box Installation Guide...

Страница 2: ......

Страница 3: ...NTIAL DAMAGES WHATSOEVER INCLUDING BUT NOT LIMITED TO LOST PROFITS ARISING OUT OF OR RELATED TO THIS MANUAL OR THE INFORMATION CONTAINED IN IT EVEN IF CABLETRON SYSTEMS HAS BEEN ADVISED OF KNOWN OR SH...

Страница 4: ...ch case the user will be required to correct the interference at his own expense WARNING Changes or modifications made to this device which are not expressly approved by the party responsible for comp...

Страница 5: ...Environment Networking Equipment for use in a Commercial or Light Industrial Environment We the undersigned hereby declare under our sole responsibility that the equipment packaged with this notice co...

Страница 6: ...Notice iv...

Страница 7: ...Power Box 1 3 Connecting Auxiliary Power Cord 1 3 Attaching Terminator 1 5 Installing Power Supplies 1 6 Powering Up Power Supplies 1 7 Replacing Power Supplies 1 8 Replacing Auxiliary Power Cord 1 8...

Страница 8: ...Contents vi...

Страница 9: ...is This guide contains the information necessary to install a power box es in a standard 19 inch equipment rack connect the auxiliary power cord to the power box attach terminator block if necessary i...

Страница 10: ...ory i e have you returned the device before is this a recurring problem etc Any previous Return Material Authorization RMA numbers Installation Install the power box and power supplies in the followin...

Страница 11: ...ch 9000 Chassis The power supply number that displays on the LCD of the 9C300 1 Environmental Module EM and local or remote management screens is a function of the connection made from the power box t...

Страница 12: ...power cord connection on the power box and tightening the screw 5 Plug the other end of the auxiliary power cord into the right auxiliary power source connector on the back of the chassis and secure...

Страница 13: ...the pins on the terminator with the corresponding connector holes and gently push the terminator in until the frame touches the chassis 4 Secure the terminator to the chassis by tightening the built i...

Страница 14: ...C power supply 4 Hold the power supply horizontally by the top and bottom handles with the bottom of the power supply toward the front of the chassis 5 Align the front of the power supply in the cente...

Страница 15: ...ource After installing the power supply ies and attaching the terminator if necessary power up the power supply ies by following the steps below 1 Plug the power cord into the power source AC receptac...

Страница 16: ...supply by following the steps below 1 Loosen the two screws on the top of the power supply 2 Press down firmly on the ejector tab on the rear of the power box to unseat the power supply 3 Grasp the to...

Страница 17: ...Class I The immunity requirements of EN 50082 1 IEC 801 2 ESD IEC 801 3 Radiated susceptibility IEC 801 4 EFT SmartSwitch 9000 Chassis Dimensions 76 2 H x 48 3 W x 49 3 D centimeters 30 H x 19 W x 19...

Страница 18: ...lling the 9C500 Plus Power Box 1 10 Plus Power Box Dimensions 22 22 H x 48 3 W x 56 52 D centimeters 8 75 H x 19 0 W x 25 25 D inches Weight Unit 5 40 kilograms 12 pounds Shipping 6 75 kilograms 15 po...

Отзывы: