background image

 

Installing the 9C500 Plus Power Box

1-6

 

Installing Power Supplies 

 

Two power supplies (either two 9C214-1 AC, or two 9C214-2 DC; but not one of 
each) can be installed in a power box. The power supplies installed in the power 
box must be identical to those attached to the back of the SmartSwitch 9000 
Chassis. For example, if two 9C214-1 AC Power Supplies are attached to the 
SmartSwitch 9000 Chassis, only 9C214-1 AC Power Supplies can be installed in a 
power box. Power supplies are installed from the rear of the power box (looking 
from the back of the power box to the front refer to Figure 1-2). The first power 
supply is installed in the right side of the power box, the second is installed in the 
left side. Complete the installation by following the steps below:

1. Remove the power supply from the shipping box and slide the two foam end 

caps off the unit. (Save the shipping box and packing materials in the event 
the power supply must be reshipped.)

2. Remove the power supply from the protective bag.

3. Plug the power cord into the power socket on the lower right front corner of 

the 9C214-1 AC power supply, or connect the power cord to the terminal block 
on the 9C214-2 DC power supply.

4. Hold the power supply horizontally by the top and bottom handles, with the 

bottom of the power supply toward the front of the chassis. 

5. Align the front of the power supply in the center of the two rails in the right 

side of the power box and slide the power supply toward the front of the 
equipment rack (Figure 1-2) until the tab on the power supply is inserted in 
the slot in the front of the power box. 

6. Align the connector on the back of the power supply above the receptacle on 

the power box.

7. Push down on the power supply handles until the frame of the power supply 

touches the surface of the power box. Do not force the power supply into 
place. If significant resistance is encountered before the frame is flush with the 
power box, remove the power supply, realign it and push it down again.

8. Secure the power supply to the power box by tightening the two screws on 

the top of the power supply.

9. If you are installing more than one power supply, repeat steps 1-8.

9C214-1 AC Power Supplies installed in the power box must be revision code HC 
or above. 9C214-2 DC Power Supplies installed in the power box may be any 
revision code. Refer to the serial number on the SmartSwitch 9000 label on the 
power supply to determine the revision code for either type of power supply. The 
last three digits of the serial number represent the revision code.

NOTE

Содержание 9C500 Plus

Страница 1: ...9031344 02 SmartSwitch 9000 9C500 Plus Power Box Installation Guide...

Страница 2: ......

Страница 3: ...NTIAL DAMAGES WHATSOEVER INCLUDING BUT NOT LIMITED TO LOST PROFITS ARISING OUT OF OR RELATED TO THIS MANUAL OR THE INFORMATION CONTAINED IN IT EVEN IF CABLETRON SYSTEMS HAS BEEN ADVISED OF KNOWN OR SH...

Страница 4: ...ch case the user will be required to correct the interference at his own expense WARNING Changes or modifications made to this device which are not expressly approved by the party responsible for comp...

Страница 5: ...Environment Networking Equipment for use in a Commercial or Light Industrial Environment We the undersigned hereby declare under our sole responsibility that the equipment packaged with this notice co...

Страница 6: ...Notice iv...

Страница 7: ...Power Box 1 3 Connecting Auxiliary Power Cord 1 3 Attaching Terminator 1 5 Installing Power Supplies 1 6 Powering Up Power Supplies 1 7 Replacing Power Supplies 1 8 Replacing Auxiliary Power Cord 1 8...

Страница 8: ...Contents vi...

Страница 9: ...is This guide contains the information necessary to install a power box es in a standard 19 inch equipment rack connect the auxiliary power cord to the power box attach terminator block if necessary i...

Страница 10: ...ory i e have you returned the device before is this a recurring problem etc Any previous Return Material Authorization RMA numbers Installation Install the power box and power supplies in the followin...

Страница 11: ...ch 9000 Chassis The power supply number that displays on the LCD of the 9C300 1 Environmental Module EM and local or remote management screens is a function of the connection made from the power box t...

Страница 12: ...power cord connection on the power box and tightening the screw 5 Plug the other end of the auxiliary power cord into the right auxiliary power source connector on the back of the chassis and secure...

Страница 13: ...the pins on the terminator with the corresponding connector holes and gently push the terminator in until the frame touches the chassis 4 Secure the terminator to the chassis by tightening the built i...

Страница 14: ...C power supply 4 Hold the power supply horizontally by the top and bottom handles with the bottom of the power supply toward the front of the chassis 5 Align the front of the power supply in the cente...

Страница 15: ...ource After installing the power supply ies and attaching the terminator if necessary power up the power supply ies by following the steps below 1 Plug the power cord into the power source AC receptac...

Страница 16: ...supply by following the steps below 1 Loosen the two screws on the top of the power supply 2 Press down firmly on the ejector tab on the rear of the power box to unseat the power supply 3 Grasp the to...

Страница 17: ...Class I The immunity requirements of EN 50082 1 IEC 801 2 ESD IEC 801 3 Radiated susceptibility IEC 801 4 EFT SmartSwitch 9000 Chassis Dimensions 76 2 H x 48 3 W x 49 3 D centimeters 30 H x 19 W x 19...

Страница 18: ...lling the 9C500 Plus Power Box 1 10 Plus Power Box Dimensions 22 22 H x 48 3 W x 56 52 D centimeters 8 75 H x 19 0 W x 25 25 D inches Weight Unit 5 40 kilograms 12 pounds Shipping 6 75 kilograms 15 po...

Отзывы: