background image

Содержание S300

Страница 1: ...up wind speed m s 2 5 2 5 2 5 2 5 Rated wind speed m s 9 6 9 6 10 5 13 Survival wind speed m s 35 35 35 35 Working form PMG PMG PMG PMG Rotating direction Clockwise Clockwise Clockwise Clockwise Blade...

Страница 2: ...2 Structure...

Страница 3: ...Slip ring 3 Hub 9 Back cover 4 Front cover 10 Flange 5 Generator case 11 Tail vane 6 Stator 12 Back nose cone 3 Installation Connect the out going cables to the terminals at the bottom of the generato...

Страница 4: ...A Install the flange on the top of the tower and make 6 pieces M10 55 bolts fasten...

Страница 5: ...B Install the blades on the hub and make 3 pieces M8 25 bolt fasten...

Страница 6: ...C Put the hub onto the shaft and make M16 nut fasten at the same time turn the blades clockwise till the hub connect the shaft tight...

Страница 7: ......

Страница 8: ...D Install the nose cone on the front of the hub and make one piece M6 40 bolt fasten...

Страница 9: ...E Connect the cable from the generator to the controller Before make sure battery and controller cable connected well...

Страница 10: ...for purchasing the EW series wind turbine systems Please read the manual carefully before installation 2 The installation should be done by the experienced technical person 3 Keep the electrical part...

Страница 11: ...Controller should be connected with battery before it connected with wind turbine 5 Do not open the generator and controller system doing the maintenance without notice or instructions 6 Installation...

Отзывы: