background image

No.

Description

No.

Description

1

Nose cone

7

Rotor

2

Blades

8

Slip ring

3

Hub

9

Back cover

4

Front cover

10

Flange

5

Generator case

11

Tail vane

6

Stator 

12

Back nose cone

3. Installation

Connect the out going cables to the terminals at the bottom of the 

generator, and elicit the cable from outlet of the bottom of the tower.

Содержание S300

Страница 1: ...up wind speed m s 2 5 2 5 2 5 2 5 Rated wind speed m s 9 6 9 6 10 5 13 Survival wind speed m s 35 35 35 35 Working form PMG PMG PMG PMG Rotating direction Clockwise Clockwise Clockwise Clockwise Blade...

Страница 2: ...2 Structure...

Страница 3: ...Slip ring 3 Hub 9 Back cover 4 Front cover 10 Flange 5 Generator case 11 Tail vane 6 Stator 12 Back nose cone 3 Installation Connect the out going cables to the terminals at the bottom of the generato...

Страница 4: ...A Install the flange on the top of the tower and make 6 pieces M10 55 bolts fasten...

Страница 5: ...B Install the blades on the hub and make 3 pieces M8 25 bolt fasten...

Страница 6: ...C Put the hub onto the shaft and make M16 nut fasten at the same time turn the blades clockwise till the hub connect the shaft tight...

Страница 7: ......

Страница 8: ...D Install the nose cone on the front of the hub and make one piece M6 40 bolt fasten...

Страница 9: ...E Connect the cable from the generator to the controller Before make sure battery and controller cable connected well...

Страница 10: ...for purchasing the EW series wind turbine systems Please read the manual carefully before installation 2 The installation should be done by the experienced technical person 3 Keep the electrical part...

Страница 11: ...Controller should be connected with battery before it connected with wind turbine 5 Do not open the generator and controller system doing the maintenance without notice or instructions 6 Installation...

Отзывы: