Operator Manual
Page 9 - 25
Initial issue: 02/13
Latest revision: -
8. CONNECTING THE MACHINE TO MAINS
Note: In order to prevent any danger during the installation, the usage or the maintenance
of the equipment, the connection to the mains must be located near the equipment
and be accessible at all times.
The BDF-e must be connected to the main power protected by a
15
A circuit breaker.
Push on main switch to set it on position “I”.
The green led lights. After a few seconds, the machine initialize itself.
Starting order : (1) Bourg Box - (2) BDF-e.
To store the parameters in the machine, wait 30 secondes, after finishing the job, before
switch off the machine.
Note: There is no switch on G.U.I., it is supplied with electricity by the BDF-e.
BDF-
e
Bou
rg B
ox
0
I
0
I
1
2
Содержание BDF-e
Страница 1: ...OPERATOR MANUAL Initial issue 02 13 Latest revision 9 133 347...
Страница 5: ...Operator Manual Page 9 5 Initial issue 02 13 Latest revision This page is intentionally left blank...
Страница 21: ...Operator Manual Page 9 21 Initial issue 02 13 Latest revision...
Страница 22: ...Operator Manual Page 9 22 Initial issue 02 13 Latest revision...
Страница 23: ...Operator Manual Page 9 23 Initial issue 02 13 Latest revision...
Страница 65: ...Operator Manual Page 9 65 Initial issue 02 13 Latest revision Identification of the baffles B C D E F H I J G A...
Страница 73: ...Operator Manual Page 9 73 Initial issue 02 13 Latest revision NOTES...
Страница 74: ...Operator Manual Page 9 74 Initial issue 02 13 Latest revision NOTES...