When all the assembled frames are in the correct position, spray paint a line on either side of each assembled frame across the
pool. This is to mark out the areas to be excavated. When these areas have been marked out, the assembled frames can be removed
from the site.
The marked areas should be excavated to a depth of 150 x 150 mm wide across the pool from one side to the other with a length
250 mm x depth 150 mm excavation at each end for the positioning of the pre-cast concrete blocks.
Note:
•
If using cement mix instead of concrete blocks, the cement mix is put in place after the assembled frames have been
positioned and leveled.
•
Concrete pads: the use of concrete blocks or concrete mix at each end of the assembled frame is critical as it
distributes the load carried by the frames evenly into the soil below. Not using concrete pads will result in the frame
sinking into the ground and disturbing the level of your pool.
•
Do not use house bricks or Besser blocks.
•
Backfill all excavated area with 8 to 1 sand and cement mix.
•
Top of the horizontal section of L supports and ground should be level.
Note:
if using cement mix instead of concrete blocks the cement mix is put in place after the assembled frames have been positioned
and leveled.
22
250mm
250mm
150mm
21
150mm
ground line
excavation depth