UK
14
9.2.10
Survey of Alarm Conditions
LED function: In normal operation the LED’s are lit corresponding to the components they represent.
“Re-start ALARM” on TP-pump:
(Nothing is working - permanent
condition)
Section 9.2.8
ALARM - Too high water level:
(Nothing is working - permanent
condition)
Section 9.2.6
ALARM -Low water pressure and
Low water level: (Nothing is
working – permanent condition)
Restore raw water pres-
sure to >0.5 bar (Section
9.2.3), then check why
water level is low (Sec-
tion 9.2.5)
Too low water level (no ALARM):
(TP-pump stopped, HP-pump is
working)
Section 9.2.5
“On-time ALARM” - on TP-pump:
(Nothing is working –
permanent condition)
Section 9.2.4
ALARM - Too low raw water
pressure: (Nothing is working -
permanent condition)
Section 9.2.3
Too low raw water pressure:
(HP-pump stopped - TP-pump is
working)
Automatic restart
(3 times) if raw water
pressure is <0.5 bar
External stop - TP-pump, can be
jumped at start-up:
(HP-pump is working)
Remove the cause for
external stop signal
External stop - HP-pump:
(TP-pump is working)
Remove the cause for
external stop signal
P
O
WER
IN
LET
H
IG
H
P
R
ESSU
R
E
P
U
MP (
H
P
-p
u
m
p
)
TR
A
N
SP
O
R
T
P
U
MP (
TP
-p
u
m
p
)
LE
VEL
A
LA
R
M
D
e
s
cripti
o
n
o
f al
arm
-
an
d fau
lt
con
diti
o
n
s
Tro
u
ble
-
s
h
o
o
ti
n
g
/
comm
e
n
ts
LED’s are lit
LED’s flashes slowly (½ Hz)
LED’s flashes rapidly (5 Hz)
The plant emits beep tone at Alarm condition (Nothing is working), which can only be neutralised by rectifying the
fault, then switching the plant OFF for 5 seconds and switching ON again.
Содержание PERMAQ COMPACT 270 Series
Страница 1: ...BWT PERMAQ COMPACT 271 274 Reverse Osmosis Plant Installation and Operating manual UK ...
Страница 2: ...UK 2 ...
Страница 10: ...UK 10 9 2 3 Alarm Low raw water pressure 9 2 4 Alarm Transport pump ...
Страница 11: ...UK 11 9 2 5 Indication Level low 9 2 6 Alarm Level high ...
Страница 12: ...UK 12 9 2 7 The plant is not operating ...
Страница 13: ...UK 13 9 2 8 Alarm The transport pump stops and starts 9 2 9 Hard water is measured at the soft water tap ...
Страница 20: ...UK 20 13 1 P I Diagram ...
Страница 21: ...UK 21 13 2 Layout Drawings ...
Страница 22: ...UK 22 ...
Страница 23: ...UK 23 ...
Страница 24: ...UK 24 ...
Страница 25: ...UK 25 13 3 Wiring Diagram ...
Страница 26: ...UK 26 ...
Страница 27: ...UK 27 ...
Страница 32: ...UK 32 13 7 Spare Parts Drawing ...