YAK 130
BVM ©2016 6 Mar. 23, 2016
Unpacking
Carefully remove items from the box. Open each package and inspect for shipping damage.
After reading this entire manual, get familiar with the major kit components.
Note: Damaged parts must be reported to BVM within 7 days of receiving your kit.
Become familiar with the work completed at the factory. It is important that you inspect and
approve this work now. It is much easier to make changes before the fuselage is assembled.
NOTE: The plastic bubble wrap that protects the parts during delivery can be used on the
work bench to protect.
Un-wrap the rear fuselage wires and tubing
leaving the bundles as shown.
The 3 bundles are from left to right:
Servo Extension Wires,
Pneumatic Tubing,
Light System Wires.
Remove the Fuel Tank Retention Former by
backing out the (4) phillips head screws.
Screws
Содержание Yak 130
Страница 58: ...YAK 130 BVM 2016 57 Mar 23 2016 Pilot s Notes...