OPERATION
2387 01/11
Operation Section 4-34
© 2011 Alamo Group Inc.
OPERA
T
ION
BACKFILLING
Approach pile with a level bucket.
Poor methods actually move no more dirt and make
it more difficult to hold a level grade.
Do not use bucket in dumped position for
bulldozing. This method, shown above, will impose
severe shock loadings on dump linkage, bucket
cylinder and tractor.
Содержание 2387
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 30: ......
Страница 31: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 36: ......
Страница 37: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 47: ...Operation Section 4 1 OPERATION SECTION...
Страница 91: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 100: ...MAINTENANCE 2387 01 11 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE...
Страница 101: ...MAINTENANCE 2387 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Страница 104: ...2387 SOM 01 11 P N 50069202 Printed U S A 2387 LOADER...