OPERATION
2387 01/11
Operation Section 4-30
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADING FROM A BANK
Choose a forward gear that provides sufficient
ground speed for loading.
Exercise caution when undercutting high banks.
Dirt slides can be dangerous. Load from as low as
possible for maximum efficiency. Loader lift and
breakaway capacity diminish as loading height is
increased.
Side cutting is a good technique for cutting down a
big pile.
If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until a
slot can be cut over the top.
Содержание 2387
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 30: ......
Страница 31: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 36: ......
Страница 37: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 47: ...Operation Section 4 1 OPERATION SECTION...
Страница 91: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 100: ...MAINTENANCE 2387 01 11 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE...
Страница 101: ...MAINTENANCE 2387 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Страница 104: ...2387 SOM 01 11 P N 50069202 Printed U S A 2387 LOADER...