OPERATION
1947/2047 01/11
Operation Section 4-30
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADING FROM A BANK
Choose a forward gear that provides sufficient
ground speed for loading.
Exercise caution when undercutting high banks.
Dirt slides can be dangerous. Load from as low as
possible for maximum efficiency. Loader lift and
breakaway capacity diminish as loading height is
increased.
Side cutting is a good technique for cutting down a
big pile.
If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until a
slot can be cut over the top.
Содержание 1947
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 32: ......
Страница 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 37: ...ASSEMBLY 1947 2047 01 11 Assembly Section 3 5 2011 Alamo Group Inc ASSEMBLY...
Страница 40: ......
Страница 41: ...Operation Section 4 1 OPERATION SECTION...
Страница 85: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Страница 97: ...MAINTENANCE 1947 2047 01 11 Maintenance Section 5 13 2011 Alamo Group Inc MAINTENANCE...
Страница 98: ...MAINTENANCE 1947 2047 01 11 Maintenance Section 5 14 2011 Alamo Group Inc MAINTENANCE...
Страница 99: ......
Страница 102: ...1947 2047 SOM 01 11 P N 50069199 Printed U S A 1947 2047 LOADER...