Maintenance | 8
Instruction Manual SECO SV_SD1010-1025C_SV_SD1040D_EN_en
17 | 32
8.1
Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The intervals
given below are considered as starting values which should be shortened or extended as appropri-
ate. Particularly harsh applications or heavy duty operation, such as high dust loads in the environ-
ment or in the process gas, other contamination or ingress of process material, can make it neces-
sary to shorten the maintenance intervals significantly.
Material of Vanes
Interval
Maintenance work
Zirkon
Monthly
●
Clean the machine from dust and dirt.
In case of an inlet filter being installed:
●
Check the inlet filter cartridge, replace if
necessary.
EK-60
Zirkon
Every 8000 hours or
once a year
●
Check the vanes (VA) and change them if
necessary.
●
Change the internal filters (IIF / IDF)
●
Change the felt washer (FW) of the dis-
charge valve (DV) (only on SV series)
EK-60
Every 3000 hours or
once a year
8.2
Change Vanes and Internal Filters