Commissioning | 7
Instruction Manual R5 RB_RC 0021 C_EN_en
15 | 32
7.2
Conveying Condensable Vapors
Water vapor within the gas flow is tolerated within certain limits. The conveyance of other vapors
shall be agreed upon with Busch.
If condensable vapors are to be conveyed:
START
●
Close the isolation valve*
●
Warm up the machine
●
Wait 30 minutes
●
Open the isolation valve* and perform the process
●
Close the isolation valve*
●
Wait 30 minutes
END
* not included in the scope of delivery