Commissioning | 6
0870572240_RA0400-0630C_Ex_-0011_IM_en
23 / 40
6
Commissioning
NOTICE
The machine can be shipped without oil.
Operation without oil will ruin the machine in short time!
• Prior to commissioning, the machine must be filled with oil, see
.
CAUTION
During operation the surface of the machine may reach temperatures of more than
70°C.
Risk of burns!
• Avoid contact with the machine during and directly after operation.
CAUTION
Noise of running machine.
Risk of damage to hearing!
If persons are present in the vicinity of a non noise insulated machine over extended
periods:
• Make sure that ear protection is being used.
• Make sure that the installation conditions (see
) are
met.
Version with water-oil heat exchanger:
• Turn on the water supply.
• If the cooling water inlet is equipped with a water bypass valve (WBV), open it for
approx. 90 seconds before the first machine start-up.
• Make sure that cooling water requirements are fully complied with, see
.
• Switch on the machine.
• Make sure that the maximum permissible number of starts does not exceed 6 starts
per hour. Those starts should be spread within the hour.
• Make sure that the operating conditions comply with the
• After a few minutes of operation, check the oil level and top up if necessary.
As soon as the machine is operated under normal operating conditions:
• Measure the motor current and record it as reference for future maintenance and
troubleshooting work.