7 | Maintenance
16 / 28
Instruction Manual FOSSA FO 0015 A - FO 0035 B_EN_en
7.1 Maintenance Schedule
The maintenance intervals depend very much on the individual operating
conditions. The intervals given below are considered as starting values
which should be shortened or extended as appropriate. Particularly harsh
applications or heavy duty operation, such as high dust loads in the
environment or in the process gas, other contamination or ingress of
process material, can make it necessary to shorten the maintenance
intervals significantly.
Interval
Maintenance work
Every 6 months or as required
• Clean the machine from dust and dirt.
• Check the inlet screen (IS), clean if necessary.
• Flush the machine by running it at atmospheric pres-
sure for about 1 minute.
In case of an inlet filter being installed:
• Check the inlet filter cartridge, clean if necessary.
In case of a gas ballast valve being installed:
• Clean the filter of the gas ballast valve.
Annually or as required
• Replace the tip seal and the non-return valve (NRV),
Tip Seal and Non-return Valve Replacement
Every 4 years, the latest after
20000 hours
• Have a major overhaul on the machine (contact
Busch).
7.2 Tip Seal and Non-return Valve Replacement
NOTICE
Changing the tip seals without training.
Loss of Busch liability!
Loss of efficiency!
• Ask your Busch representative before performing this maintenance task.
• Order the Busch genuine service kit.
• Follow the service instructions (document ref. 0870 202 845) delivered with the ser-
vice kit (see Spare Parts) before performing this maintenance task.