5 | Installation
12 / 32
0870231039_LG_LR_-_IM_en
5.2.3 Operating Liquid Connection
I
G (SSI)
F (OPI)
H
K
J (ADV)
K
F
Operating liquid inlet (OPI)
G
Shaft seal flush connection (SSI)
H
Clean and drain connection
I
Stuffing box drain plug
J
Automatic drain valve (ADV)
K
Casing drain plugs
Connection sizes:
Machine type
F
G
H
I
J
K
LG 0890 A
G2"
G1"
G1½"
G¾"
G1"
G¾"
LG 1200 A
DN 65 PN 10 DN 25 PN 10 G1½"
G¾"
G1"
G¾"
LG 1910 A
DN 80 PN 10 DN 25 PN 10
G2"
G¾"
G1"
G¾"
LG 2680 A
DN 80 PN 10 DN 25 PN 10 G1½"
G¾"
G1"
G¾"
LR 0700 A
DN 50 PN 10 DN 20 PN 10 G1½"
G¾"
G1"
G¾"
LR 1190 A
DN 65 PN 10 DN 25 PN 10 G1½"
G¾"
G1"
G¾"
LR 1560 A
DN 80 PN 10 DN 25 PN 10
G2"
G¾"
G1"
G¾"
LR 2200 A
DN 80 PN 10 DN 25 PN 10 G1½"
G¾"
G1"
G¾"
• Make sure that the operating liquid complies with the requirements, see
.
5.3 Operating Liquid Settings
The machine cannot operate without an operating liquid system. The actual scope of de-
livery is always contractually agreed upon.