background image

Every 16 000 hours of operation, at the latest
after 4 years:

l

Drain the oil (see “Draining the oil”)

l

A main inspection of the vacuum pump (Busch)

Lock Out/ Tag Out procedure

l

Stop the pump with the remote control (press on STOP button
during 10s)

l

Press on emergency stop button

l

Switch off the main disconnect switch

l

Switch off the customer’s power supply

l

Switch off the water (inlet first, then outlet) and nitrogen quick
connections

l

Put the label or warning board “Maintenance processing” on or
next to the pump

Safety Lockout procedure

l

Take off the label or warning board “Maintenance processing”

l

Check the cooling liquid and oil levels according to the chapters
“Checking the oil level” and “Checking the cooling liquid level”

l

Open the power box cover and check that the FDP1 thermal relay
is on manual reset position

l

Close the cover

l

Switch on the main disconnect switch

l

Release the emergency stop button

l

Switch on the water (outlet first, then inlet) and nitrogen quick
connections

l

Make sure that the “Necessary installation instructions” are
followed

l

Start the pump with the remote control (press on START button)

Checking the oil

Checking the oil level

l

Make sure that the vacuum pump has been switched off and that
it cannot be switched on again accidentally

l

Indication of the oil level on the various oil sight glasses

Oil level, pump not operating

COBRA NS (DP) vacuum pump

If the oil level lies below the target circle:

u

Top up with oil (see “Refilling oil”)

If the oil level exceeds the target circle:

u

Check the condensate drain

l

Drain the oil (see “Draining the oil”)

WZ (MB) rotary lobes vacuum pump

If the oil level does not reach the target circle:

u

Top up with oil (see “Refilling oil”)

If the oil level exceeds the target circle:

u

Check the condensate drain

l

Drain the oil (see “Draining the oil”)

Refilling oil

NOTE

: Oil does not normally have to be refilled outside the recom-

mended oil change intervals. A drop in the oil level indicates a fault
(see “Troubleshooting”).

CAUTION

Only fill in oil through the oil filler plugs.

CAUTION

Danger of burns when the oil filler plugs are open.

Danger of injuries when the oil filler cap is not screwed on properly.

Only unscrew the oil filler cap when the vacuum pump has been
switched off.

The vacuum pump may only be switched on when the oil filler cap
is properly closed and tight.

l

Make sure that the vacuum pump has been switched off and that
it cannot be switched on again accidentally

l

Unscrew the oil filler plugs of the DP and MB vacuum pumps (if
necessary)

COBRA NS (DP) vacuump pump

l

Fill in oil up to the top of the target circle of the oil sight glasses

l

Make sure that the oil level is in the top of target circle of the oil
sight glasses

l

Make sure that the seals of the filler cap are not damaged and that
they sit properly. Replace them if necessary

l

Screw on the filler cap again

WZ (MB) rotary lobes vacuum pump

l

Fill in oil up to the top of the target circle of the oil sight glasses

l

Make sure that the oil level lies in the target circle of the oil sight
glasses

l

Make sure that the seals of the filler cap are not damaged and that
they sit properly. Replace them if necessary

l

Screw on the filler cap again

Maintenance

DS 3010 E

Page 20

0870771509 (En)

MAX

MIN

MAX

MIN

MAX

MIN

Содержание COBRA DS 3010 E

Страница 1: ...Screw Vacuum Pumps and Roots Pumps COBRA DS 3010 E Standard version Busch Manufacturing Korea Ltd 189 51 Soicheon ro Majang myun Icheon si Gyunggi do 467 813 Republic of Korea 0870771509 181024 Origin...

Страница 2: ...am 19 Weekly 19 Monthly 19 Yearly 19 Every 16 000 hours of operation at the latest after 4 years 20 Lock Out Tag Out procedure 20 Safety Lockout procedure 20 Checking the oil 20 Checking the oil level...

Страница 3: ...3010 E 0870771509 En Page 3 DP IN OUT ESS MSH PTB RC COBRA DS 3010 E DP Backing vacuum pump DP 600 C ESS Emergency stop switch IN Inlet MSH Main switch OUT Discharge to silencer PTB Pump terminal box...

Страница 4: ...le of cylinder DGR2 Regulating valve dilution gas end of cylinder ECO Power connection EV Expansion vessel FME Flow meter nitrogen FS 1 Flow switch cooling liquid FS 2 Flow switch cooling water HE Hea...

Страница 5: ...rogen system NC Nitrogen supply OSG 1 Oil level indicator DP OSG 2 Oil level indicator DP OSG 3 Oil level indicator MB OSG 4 Oil level indicator MB PGI Process gas inlet PGO Process gas outlet PRV Nit...

Страница 6: ...id is above 100 C The pump will stop immediately after the emergency alarm ring a direct cooling water circuit in the motors in the cylinder covers A and B side of WZ rotary lobes vacuum pump and COBR...

Страница 7: ...and instruct his personnel accordingly Local regulations regarding the motors and electric control elements must be observed when installing the pump in potentially explosive environments The maintena...

Страница 8: ...l Switch off the water inlet first then outlet and nitrogen quick connections l Put the label or warning board Maintenance processing on or next to the pump Safety Lockout procedure l Take off the lab...

Страница 9: ...ges are closed put on the protective caps included in the delivery package of the vacuum pump l Store the vacuum pump if possible the vacuum pump should be stored in its original packaging indoors dry...

Страница 10: ...ills the requirements for assembly dismantling l Make sure that no temperature sensitive parts for example of plastic wood cardboard paper electronic parts come into contact with the hot surfaces of t...

Страница 11: ...e that the regulations of the Electromagnetic Compatibility Directive 2014 30 EU as well as standard EN norms safety directives and especially local and national regulations are observed this is the r...

Страница 12: ...g direction it can be destroyed even if this is the case for only a short moment Make sure that the vacuum pump is connected correctly before switching it on l Determine rotation sense of the motor by...

Страница 13: ...ically tight NOTE It is easier to switch on the vacuum pump with cold oil when the intake line is not closed or when the intake flange is not covered by a rubber plate l Start the vacuum pump If the i...

Страница 14: ...um pump at the time of rise does not exceed 5 compared to the horizontal In the event of too important slope 5 risk of oil leakage in the workspace l Before each transport requiring a means of adapted...

Страница 15: ...issible number of startings per hour 6 As far as temperature is concerned the pump is suitable for continuous duty at any pressure between atmosphere and ultimate pressure The vacuum pump is tight dow...

Страница 16: ...ent Level Time Before and DP Idle are idle CAUTION LL Mode Off is not recommended for Load Lock cyclic pumping due to the current load and the mechanical stress with full speed l LL Mode Auto u The mo...

Страница 17: ...XTERN DS 3010 E Standard operational time chart 0870771509 En Page 17 LCD start or Remote start tool pump Pump speed Booster Dry pump Pump ready pump tool Process on tool pump 1 Cold start 2 MB on del...

Страница 18: ...sec 2 MB on delay 30 sec Standard operational time chart DS 3010 E Page 18 0870771509 En Pump speed Booster Dry pump Pump ready pump tool Chamber open close gate valve on off 1 Cold start 2 MB on del...

Страница 19: ...oling liquid and oil levels according to the chapters Checking the oil level and Checking the cooling liquid level open the power box cover and check that the FDP1 thermal relay is on manual reset pos...

Страница 20: ...the condensate drain l Drain the oil see Draining the oil WZ MB rotary lobes vacuum pump If the oil level does not reach the target circle u Top up with oil see Refilling oil If the oil level exceeds...

Страница 21: ...gs again and drain any remaining oil l Check that no metal swarf sticks to the magnet of the drain plug clean if necessary l Refit the oil drain plugs and tighten up l Dispose of the used oil in compl...

Страница 22: ...of cylinder upper plate l Screw on the cooling liquid filler cap again l If liquid has run on to the outside surfaces of the vacuum pump wipe it off Draining the cooling liquid l Make sure that the v...

Страница 23: ...nto pores openings and other internal parts of the vacuum pump There is a health hazard when dismantling the vacuum pump There is also a danger to the environment Prior to shipping the vacuum pump mus...

Страница 24: ...ot be dismantled drain the oil u dispose of the oil according to local environmental protection regulations drain the cooling liquid u dispose of the cooling liquid according to local environmental pr...

Страница 25: ...to hazardous pump conditions which could cause personal injury Oil quantity The quantity of oil specified in the following table is of informative nature only Check the oil level with the help of the...

Страница 26: ...of informative nature only Respect the procedure of filling the cooling liquid Quantity Zitrec M 25 already mixed ready to use DS 3010 E approx 26 litres CAUTION The proportion of pure glycol and wate...

Страница 27: ...5 15 Nominal motor speed DP 60 Hz min 1 3600 Nominal motor speed MB 90 Hz min 1 5400 Noise level EN ISO 2151 50 Hz 60 Hz dB A dB A 75 Ambient temperature C F 0 40 32 104 Maximal counter pressure Disch...

Страница 28: ......

Страница 29: ...equipment and following the standards Standard Title of the standard EN ISO 12100 2010 Safety of machinery Basic concepts general principles of design EN ISO 13857 2008 Safety of machinery Safety dis...

Страница 30: ...Note...

Страница 31: ...Note...

Страница 32: ...Majang myun Icheon si Gyunggi do 467 813 Republic of Korea Phone 82 31 645 2700 Fax 82 31 631 2898 e mail busch busch co kr Malaysia Busch Malaysia Sdn Bhd 4 6 Jalan Taboh 33 22 Seksyen 33 Shah Alam T...

Отзывы: