23/240
In contrast to scenes, the time-delayed processing of sequential actions is possible
with sequences. Different pause times can be inserted between actions for sequences
and sequences can also be interrupted or stopped.
4.7 Weekly
programs
Processes occurring on a weekly basis (scenes and sequences) can be set in a clearly
arranged way and automated in any number of weekly programs.
The weekly programs are only be created by the electrician using the panel setup tool.
The user can carry out the desired arrangement and adaptations on the panel.
Содержание Busch-ComfortTouch
Страница 1: ...Product manual Busch ComfortTouch Busch ComfortTouch www BUSCH JAEGER de ...
Страница 16: ...16 240 ...
Страница 147: ...147 240 03_03_09_00_EN html Logikbausteine ...
Страница 155: ...155 240 03_03_09_00_EN html Logikbausteine 03_03_09_00_EN html Boolean ...
Страница 163: ...163 240 other values 1 logical true 03_03_09_00_EN html Boolean 03_03_09_00_EN html Vergleicher ...
Страница 215: ...215 240 String 0 or other false true 03_03_09_00_EN html weitere_math 03_03_09_00_EN html weitere_math ...
Страница 217: ...217 240 03_03_09_00_EN html weitere_math 03_03_09_00_EN html weitere_math ...
Страница 219: ...219 240 DPTDate true String 0 or other false true 03_03_09_00_EN html weitere_math 03_03_09_00_EN html Signalkontrolle ...
Страница 222: ...222 240 other true otherwise 0 03_03_09_00_EN html Signalkontrolle 03_03_09_00_EN html Signalkontrolle ...
Страница 224: ...224 240 other true otherwise 0 03_03_09_00_EN html Signalkontrolle 03_03_09_00_EN html Signalkontrolle ...
Страница 226: ...226 240 03_03_09_00_EN html Signalkontrolle ...
Страница 234: ...234 240 String Number if possible otherwise 0 03_03_09_00_EN html Signalkontrolle 03_03_09_00_EN html Signalkontrolle ...
Страница 238: ...238 240 String Number if possible otherwise 0 03_03_09_00_EN html Signalkontrolle 03_03_09_00_EN html Signalkontrolle ...