background image

12 Madara Blvd.,

9700 Shumen, Bulgaria

t: +359 54 874 555

f: +359 54 874 556

e-mail: [email protected]

13 Chelopeshko Shose Str,

1839 Sofia, Bulgaria

t: +359 2 903 97 80

f: +359 54 874 556

e-mail: [email protected]

www.sunsystem.bg

Содержание WBS Active Pell

Страница 1: ...Set pellet boiler with pellet burner WBS Active Pell Version i0 2 6 EN TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL FOR AUTHORIZED INSTALLER SERVICE SHOP...

Страница 2: ...ng the boiler to the heating installation 12 7 4 Connection diagrams 14 7 5 Pellet burner connection to the fuel hopper and pellet auger 18 7 6 Connecting the pellet burner to the mains power supply 1...

Страница 3: ...e observed local construction regulations on the installation air supply and exhaust gas extraction as well as chimney connection regulations and norms concerning the fitting of the heating installati...

Страница 4: ...bjects onto the heating boiler or in its proximity see diagram 1 for the minimum clearances Do not store flammable materials in the boiler room 1 2 3 Minimum clearances for installation and combustibi...

Страница 5: ...ed to heat up heating boilers The built in control unit automatic cleaning system and internal pellet auger ensure the automated operation of the burner and optimal burning of the fuel Design The burn...

Страница 6: ...n chamber Air feed fan step regulated 0 to 100 2 3 Burner safety devices Elbow shape feeder chute The geometrical shape of burner feeder chute prevents backfire entry from burner into pellet hopper Th...

Страница 7: ...adjust since the fuel quantity in the combustion chamber remains constant and predictable Fuelefficiency Highcombustionefficiency is also determined by consistently low moister content of pellets cons...

Страница 8: ...Plumbum content mg kg 2 10 10 10 Nickel content mg kg 2 10 10 10 Zinc content mg kg 2 100 100 100 1 Not more than 1 of the pellets may be longer than 40 mm max Length 45 mm 2 Dry weight 3 Particles 3...

Страница 9: ...p Control unit 2 Feeding chute 3 Fire irons 4 Auger 5 Technical passport Installation and operation manual 6 Service booklet and Warranty card 3 Fuel Hopper 4 Mounting kit for particular model burner...

Страница 10: ...ips tear upon pulling doors seal tightly Caution Inadequate adjustment of the hinges may result in air being sucked in through the doors and the boiler burning uncontrollably 7 SETUP OF THE HEATING BO...

Страница 11: ...bustion products and outside air We recommend that you use chimney fitted with flue terminal Heating specialist must calculate the precise sizing of the chimney 7 2 Connecting the safety heat exchange...

Страница 12: ...o the heating installation Such connection must be performed by a technician service shop authorized for such operations When the boiler is connected to a heating system it is mandatory to install a 3...

Страница 13: ...anual 3 2 Low performance of the automatic cleaning system 3 2 Increase turn on frequency of the automatic cleaning system 3 3 Improper setting of fuel air mixture 3 3 Adjust using gas analyzer 4 Smok...

Страница 14: ...LATION and OPERATION MANUAL 7 4 Connection diagrams Such connections must be performed by a technician service shop authorized for such operations CH Pump Sensor Boiler Diagram 6 Connection of WBS Act...

Страница 15: ...ALLATION and OPERATION MANUAL Sensor Buffer top Sensor Buffer bottom CH Pump Sensor Boiler Diagram 7 Connection of WBS Active Pell boiler to P type buffer tank and three way valve Sensor Boiler water...

Страница 16: ...PASSPORT INSTALLATION and OPERATION MANUAL Sensor Boiler Sensor Buffer top Sensor Buffer bottom CH Pump Diagram 8 Connection of WBS Active Pell boiler to combi tank KSC2 flat plate solar collector PK...

Страница 17: ...Sensor Boiler Sensor DHW Sensor Buffer top Sensor Buffer bottom CH Pump DHW Pump Diagram 9 Connection of WBS Active Pell boiler to solar tank SON buffer thank P flat plate solar collector PK and three...

Страница 18: ...the pellet burner to the mains power supply Such connection must be performed by a technician service shop authorized for such operations Caution ELECTRIC SHOCK HAZARD Before opening the unit switch...

Страница 19: ...on Electric motor model 8IN25GN4C blue brawn black Capacitor 1 5 F 450V red 8IN25GN4C Electric motor model 4IK25GN C blue red white Capacitor 2 5 F 450V 4IK25GN C OD PT WH B RB PS RT FC IGN PWH PH SB...

Страница 20: ...ces sensors to the burner Power Supply 220 V L N L N Fuel Feeder CH Pump 220 V DHW Pump 220 V L N Room Therm L N L N NPBC V3M 2 Bu er top Sensor DHW Sensor Bu er bo om Sensor Boiler water mantle tempe...

Страница 21: ...ues ash noncombustible inclusions etc built up into the combustion chamber of the boiler These automatic cleaning cycles last several seconds and can be additionally adjusted as well as their repeat r...

Страница 22: ...ng must be carried out periodically and adequately every 3 to 5 days Ash accumulated in the combustion chamber condensed moisture and tar deposits significantly reduce the life span and performance of...

Страница 23: ...es Disposing of ashes into public garbage containers may cause fire 9 1 1 Preparing for the new heating season Recommended boiler maintenance procedures 1 Remove internal safety gates inside the boile...

Страница 24: ...e the prescribed rated temperature of the return water The eco friendly operation of the boiler is realized at rated output It is recommended to install a storage buffer tank and pump type group with...

Страница 25: ...is set Summer heating mode Only DHW pump is active Burner flame symbol appears in upper right part of display Means that burner is activated Burner goes into Ignition mode and upcoming boiler fire up...

Страница 26: ...nsor of lower part of buffer tank when is chosen scheme with buffer tank CH top E1 Temperature sensor of upperr part of buffer tank is missing when is chosen scheme with buffer tank CH top E2 Short ci...

Страница 27: ...h on off temperature Use UP and DOWN arrow keys to select desired temperature in Set Temp _ _ and hysteresis in Hysteresis _ _ Upon reaching the preset temperature of water in boiler the DHW pump will...

Страница 28: ...ws CH DHW Both pumps CH central heating pump and DHW domestic hot water pump are active CH only In this mode of operation the only active pump is the CH circulation pump for the heating installation C...

Страница 29: ...on of the heating installation must be performed by an authorized installer service Some of these reasons may affect the safe operation of the facility 10 3 1 Cleaning setup Theburnerperforms automati...

Страница 30: ...de to lower step modulation Example We have set maximum temperature of 85 Upon reaching 77 the burner will shift down to lower mode of operation two flames Upon reaching 82 the burner enters into stil...

Страница 31: ...d This submenu allows you to adjust the parameters of the suspended mode of operation of the burner You can modify the pellet quantity Feed time interval at which these pellets are fed Cycle and fan o...

Страница 32: ...g the boiler management via thermostat option the boiler will be controlled by the signal input from the thermostat whereas the options are thermostat normally open or thermostat normally closed Its t...

Страница 33: ...t This menu is for installers only and it is active and visible only if the controller is in Standby mode Test EFan Speed Use this menu to test the fan exhaust if installed You can control the fan in...

Страница 34: ...mple the amount of pellets collected in the bag over a 15 minute period is 4320 grams 900 sec We then divide 4320 by 900 and get 4 8 grams of pellets per 1 second Repeat the measurement in order to ob...

Страница 35: ...s analyzer analyzer Mode Medium output mode It is indicated by two flames We recommend to set value at 50 of the main mode Pellet auger running time Feed 3sec 12 5kW 6 50 3 Main combustion cycle Cycle...

Страница 36: ...20 sec Fan B E 20 1 23 1 20 1 20 1 22 1 32 1 Setup Feed 1 1 sec 1 8 sec 3 sec 3 sec 2 1 sec 2 7 sec Cycle 20 sec 20 sec 20 sec 20 sec 20 sec 20 sec Fan B E 25 1 20 1 17 1 17 1 15 1 17 1 Suspend Feed 5...

Страница 37: ...e 3 bar Diagram 14 Elemets of WBS Active Pell 1 Housing 2 High efficiency thermal insulation 3 Safety heat evacuator exchanger 4 Three pas flue gas flow 5 Water mantle 6 Combustion chamber 7 Metal ash...

Страница 38: ...r 10 0 10 10 0 10 Insulation Boiler Doors high efficiency thermal wool high efficiency thermal wool Average power consumtion Boler WBS Active W 60 60 Burner Pell Firing Up mode W 400 400 Operate mode...

Страница 39: ...30 36 0 36 high efficiency thermal wool high efficiency thermal wool 60 60 60 110 110 110 400 400 400 400 400 400 60 70 60 70 60 70 70 110 70 110 70 110 1300 1300 1300 1300 1300 1300 230 50 230 50 230...

Страница 40: ...40 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Diagram 15 Dimensions of WBS Active Pell D...

Страница 41: ...x 2 82801300000011 2 82801300000012 3 89801300000006 3 89081300000020 3 89801300000024 4 89800000000005 4 89080000000008 5 89801381000001 5 89801381000002 5 89081300000023 6 78801100000001 7 83801200...

Страница 42: ...requirements At the end of life cycle of each product its components are due to be disposed of in conformity with regulatory prescriptions AccordingtoDirective2002 96 ECregarding electrical and electr...

Страница 43: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Страница 44: ...Blvd 9700 Shumen Bulgaria t 359 54 874 555 f 359 54 874 556 e mail ftrade sunsystem bg 13 Chelopeshko Shose Str 1839 Sofia Bulgaria t 359 2 903 97 80 f 359 54 874 556 e mail sales sunsystem bg www sun...

Отзывы: