6
EN
TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL
Diagram 3. Overall dimensions of boiler body
and pallet, model WBS /see page 55/
Table 3.
Model
A, mm B, mm C, mm D, mm Weight,
kg
WBS 20
560
1020
125
1225
210
WBS 25
560
1020
125
1225
230
WBS 30
560
1020
125
1225
250
WBS 40
660
1080
125
1225
290
WBS 50
660
1080
125
1225
315
WBS 70
720
1200
125
1375
385
WBS 90
720
1200
125
1375
420
WBS 110 780
1200
125
1375
450
5. DELIVERY OF THE BOILER
• Inspect the integrity of the packaging upon
delivery.
• Check whether all components have been
delivered to you. Boiler scope of delivery includes:
1) Boiler body with boiler doors
2) Safety valve 3 bar
3) Fire irons
4) Cleaning brush for flue pipes
5) Technical passport. Installation and operation
manual
6) Service booklet and Warranty card
If any of the above items are missing, contact your
supplier.
6. INSTALLATION OF THE HEATING BOILER
*
The assembly, installation and setup of
boiler must be performed by a technician
authorized for such operations.
Installer must indicate to the user of the
installation the minimum clearances from
flammable materials and liquids.
6.1. Requirements:
- Boiler room must be frost-proof;
- Boiler room must allow for continuous access of air
necessary to maintain combustion;
- Boilers must not be placed in inhabitable rooms;
- All boiler rooms must have correctly calculated vent
depending on the boiler output. The vent must be
protected by means of a net or grate.
The size of the vent is calculated according to the
formula:
А = 6,02
*
Q
- where:
А
– area of the vent in cm
2
,
Q
– boiler output in kW
- Remove the packaging without polluting the
environment
- Observe building supervision instructions, in
particular the existing Ordinance on combustion
devices and storage of combustion materials, on
building requirements applicable to installation sites
and on ventilation;
- The boiler must be placed on a foundation whose
surface area is larger than the base of the heating
boiler according to diagram 1;
- The boiler must be placed in a position which allows
for the easiest possible cleaning and servicing;
- Installation must be carried out according to
installation diagram 1 which shows the boiler
housing;
- No objects made of flammable materials or liquids
may be placed on/near the boiler;
Steps to assemble the panels of the boiler housing
Step 1:
Fix the side panels 1 to Foundation 6 by
using Rivet М8 х 16 mm – 2 pcs.
Step 2:
Fix the Back panel 2 to Foundation 6 by
using Rivet М8 х 16 mm – 2 pcs. And fix the
the Back panel 2 to Side panels 1 by using
Screw М5 x 16 mm – 2 pcs.
Step 3:
Fix Front lower panel 3 to side panels 1 by
using Screw М5 x 16 mm – 2 pcs.
Step 4:
Fix Front upper panel 4 to side panels 1 by
using Screw М5 x 16 mm – 2 pcs.
Step 5:
Mount thermometer 9 - place the probe 10
into sensor sleeve 11
Step 6:
Fix the Cover panel 5 to side panels 1 by
using Screw М5 x 16 mm – 4 pcs.
*
Necessary tool when assembling boiler housing -
screwdriver (screwdriver with cross tip).
Make sure the boiler housing is assembled stable.
6.2. Assembly / disassembly of the boiler housing
Diagram 4. Elements of boiler housing, model
WBS /see page 56/
Table 4
№
Element
pcs
1
Side panel with insulation
2
2
Back panel with insulation
1
3
Front lower panel with insulation
1
4
Front upper panel with insulation
1
5
Cover panel and thermometer, with
insulation
1
6
Foundation
1
7
Screw М5 x 16 mm
10
Содержание WBS 110
Страница 2: ......
Страница 55: ...55 1 2 3...
Страница 57: ...57 6 7...
Страница 58: ...58 8...
Страница 59: ...59 9...
Страница 60: ...60 10...
Страница 61: ...61 11...
Страница 62: ...62 12 13...
Страница 63: ......