3
EN
TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL
TABLE OF CONTENTS
1.
EXPLANATION OF SYMBOLS AND SAFETY INSTRUCTIONS ..................................................................... 4
1.1. Explanation of symbols
.......................................................................................................................... 4
1.2. Requirements to boiler installation room
.............................................................................................. 4
1.2.1. Instructions to boiler installer
................................................................................................................ 4
1.2.2. Instructions to installation user
.............................................................................................................. 4
1.2.3. Minimum clearances for installation and combustibility of building materials
........................................ 4
2.
PRODUCT DESCRIPTION ......................................................................................................................... 5
3. FUELS
...................................................................................................................................................... 5
4.
TRANSPORTATION OF THE BOILER ......................................................................................................... 5
5.
DELIVERY OF THE BOILER ....................................................................................................................... 6
6.
INSTALLATION OF THE HEATING BOILER ................................................................................................. 6
6.1. Requirements
......................................................................................................................................... 6
6.2. Assembly / disassembly of the boiler housing
....................................................................................... 6
6.3. Check door tightness
.............................................................................................................................. 7
7.
SETUP OF THE HEATING BOILER ............................................................................................................. 7
7.1. Connecting the boiler to a chimney
....................................................................................................... 7
7.2. Connecting the thermostatic draft regulator -air flow regulator
........................................................... 7
7.3. Connecting the safety heat exchanger
................................................................................................... 7
7.4. Connecting the boiler to the heating installation
................................................................................... 7
7.5. Connection diagrams
............................................................................................................................. 8
8.
FILLING THE HEATING INSTALLATION ..................................................................................................... 9
9.
OPERATION OF BOILER ........................................................................................................................... 9
9.1. Loading and ignition the boiler
.............................................................................................................. 9
9.2. Adjust the boiler combustion by thermostatic draft regulator
.............................................................. 9
9.3. Cleaning of the boiler
............................................................................................................................. 9
9.4. Important recommendations for long-lasting and correct operation of the boiler
................................... 10
10.
WARRANTY TERMS ............................................................................................................................... 10
11.
TECHNICAL PARAMETERS OF BOILER WBS ........................................................................................... 10
11.1. General features
................................................................................................................................... 10
11.2. Technical parameters
........................................................................................................................... 11
12. RECYCLING
............................................................................................................................................ 12
APPENDIX A - DIAGRAMS
..................................................................................................................... . 55
Содержание WBS 110
Страница 2: ......
Страница 55: ...55 1 2 3...
Страница 57: ...57 6 7...
Страница 58: ...58 8...
Страница 59: ...59 9...
Страница 60: ...60 10...
Страница 61: ...61 11...
Страница 62: ...62 12 13...
Страница 63: ......