Operate the boiler with steam in the entire
system for a few days allowing the condensate
to return to the boiler. If the condensate can
temporarily be wasted, operate boiler only for
the length of time it takes for condensate to run
clear. If the latter cannot be achieved or if the
condensate is returned to the boiler, boil out
the boiler using the SURFACE BLOW-OFF
connection, see Figure 5.
i
.
Drain boiler until 1” of water is visible in
gauge glass. Run temporary 1½” NPT pipe
line from the surface blow-off connection to
an open drain or some other location where
hot water may be discharged safely. Do not
install valve in this line.
ii
. Drain about 5 gallons of hot water from
boiler into a container and dissolve into it
an appropriate amount of recommended boil
out compound. Remove safety valve & add
solution to boiler water thru exposed tapping
using a funnel.
E
C
I
T
O
N
l
a
c
o
l
t
l
u
s
n
o
c
r
o
s
e
i
t
i
r
o
h
t
u
a
l
a
c
o
l
h
t
i
w
k
c
e
h
C
e
l
b
a
t
p
e
c
c
a
r
o
f
s
e
c
i
v
r
e
s
t
n
e
m
t
a
e
r
t
r
e
t
a
w
.
s
d
n
u
o
p
m
o
c
g
n
i
n
a
e
l
c
l
a
c
i
m
e
h
c
iii
. Start burner and operate suffi ciently to boil
the water without producing steam pressure.
Boil for about 5 hours. Open boiler feed
pipe suffi ciently to permit a steady trickle
of water from the surface blow-off pipe.
Continue this slow boiling and trickle of
overfl ow for several hours until the water
coming from the overfl ow is clear.
iv
. Stop burner and drain boiler in a manner
and to a location that hot water can be
discharged with safety.
v
. Refi ll boiler to normal water line. If water
in gauge glass does not appear to be clear,
repeat steps (
i
. thru
iii
.) and boil out the
boiler for a longer time.
b. Low pressure steam boilers such as the V8
Series should be maintained with appropriate
water treatment compounds. Add suitable water
treatment compounds as recommended by your
qualifi ed water treatment company.
c. Remove temporary surface blow-off piping, plug
tapping and reinstall safety valve. Boil or bring
water temperature to 180°F promptly in order to
drive off the dissolved gases in the fresh water.
d. If unsteady water line, foaming or priming
persist, install gate valve in Hartford Loop and
drain valves in return main and at boiler as
shown in Figure 14 and proceed as follows:
i
Connect hoses from drain valves to fl oor
drain. Close gate valve in Hartford Loop and
open drain valve in return main. Fill boiler
to normal water level, turn on oil burner and
operate boiler at this water level for at least
30 minutes after the condensate begins to
run hot, then turn off burner.
Close all radiator valves. Remove all supply
main air valves and plug the openings in
supply main.
ii.
Draw about 5 gallons of hot water from
boiler into a container and dissolve into it
the appropriate amount of a recommended
boilout compound. Remove safety valve
from boiler and pour this solution into
boiler, then reinstall safety valve.
iii
. Turn on oil burner and keep operating while
feeding water to boiler slowly. This will
raise water level in boiler slowly so that
water will be boiling hot and will rise slowly
into supply main and back through return
main, fl owing from drain hose at about
180°F. Continue until water runs clear from
drain hose for at least 30 minutes.
iv
. Stop feeding water to boiler but continue
operating oil burner until excess water in
boiler fl ows out through supply main and
water lowers (by steaming) until it reaches
normal level in boiler. Turn off oil burner.
Drain boiler. Open all radiator valves.
Reinstall all supply main air valves. Open
gate valve in Hartford Loop.
v
. When boiler has cooled down suffi ciently
(crown sheet of sections are not too hot to
touch), close the drain valves at boiler and
in return main and feed water slowly up to
normal level in boiler. Turn on oil burner
and allow boiler to steam for 10 minutes,
then turn off burner. Draw off one quart of
water from bottom gauge glass fi tting and
discard. Draw off another quart sample and
if this sample is not clear, repeat the cycle
of draining the boiler and return main and
refi lling the boiler until sample is clear.
vi
. If the boiler water becomes dirty again
at a later date due to additional sediment
loosened up in the piping, close gate valve
in Hartford Loop, open drain valve in
return main, turn on oil burner and allow
Condensate to fl ow to drain until it has run
clear for at least 30 minutes while feeding
water to boiler so as to maintain normal
water level. Turn off oil burner, drain boiler,
open gate valve in Hartford Loop, then
repeat Step 1 above.
e. Make pH or
Alkalinity Test.
After boiler and system have been cleaned and
refi lled as previously described, test the pH of
the water in the system. This can easily be done
by drawing a small sample of boiler water and
Содержание V8 Series
Страница 6: ...6 Figure 1A V82 thru V89 Water Boiler without Tankless Heater ...
Страница 7: ...7 Figure 1B V83 thru V89 Water Boiler with Front Tankless Heater ...
Страница 8: ...8 Figure 1C V83 thru V89 Water Boiler with Rear Tankless Heater ...
Страница 9: ...9 Figure 1D V83 thru V89 Steam Boiler with or without Tankless Heater ...
Страница 27: ...27 Figure 11B Top View Burner Swing Door Mounted to Cast Iron Block Assembly Jacket Removed for Clarity ...
Страница 33: ...33 Figure 13A Recommended Water Piping for Circulator Zoned Heating System ...
Страница 34: ...34 Figure 13B Recommended Water Piping for Zone Valve Zoned Heating System Supply Side Circulator ...
Страница 35: ...35 Figure 13C Recommended Water Piping for Zone Valve Zoned Heating System Return Side Circulator ...
Страница 46: ...46 Figure 19A Wiring Diagram Steam Hydrolevel CG450 Probe LWCO for Carlin Burners ...
Страница 47: ...47 Figure 19B Wiring Diagram Steam Hydrolevel CG450 Probe LWCO for Riello Burners ...
Страница 49: ...49 Figure 20A Wiring Diagram Steam McDonnell Miller PS 801 Probe LWCO for Carlin Burners ...
Страница 50: ...50 Figure 20B Wiring Diagram Steam McDonnell Miller PS 801 Probe LWCO for Riello Burners ...
Страница 52: ...52 Figure 21A Wiring Diagram Steam McDonnell Miller 67 Float LWCO for Carlin Burners ...
Страница 53: ...53 Figure 21B Wiring Diagram Steam McDonnell Miller 67 Float LWCO for Riello Burners ...
Страница 55: ...55 Figure 22A Wiring Diagram Water without Tankless Heater for Carlin Burners ...
Страница 56: ...56 Figure 22B Wiring Diagram Water without Tankless Heater for Riello Burners ...
Страница 58: ...58 Figure 23B Wiring Diagram Water with Front Tankless Heater for Carlin Burners ...
Страница 59: ...59 Figure 23C Wiring Diagram Water with Front Tankless Heater for Riello Burners ...
Страница 62: ...62 Figure 23F Wiring Diagram Water with Rear Tankless Heater for Riello Burners ...
Страница 82: ...82 Bare Boiler Assembly ...
Страница 84: ...84 Bare Boiler Assembly Continued ...
Страница 86: ...86 Jacket Assembly ...
Страница 88: ...88 V83 Thru V89 Steam Boilers Trim and Controls ...
Страница 90: ...90 V82 Thru V89 Water Boilers Trim and Controls ...
Страница 92: ...92 Beckett AFG Burner ...
Страница 98: ...98 SERVICE RECORD DATE SERVICE PERFORMED ...