44
O.
ELECTRIC WIRING
- Install all field wiring in
accordance with the National Electric Code and Local
Regulations.
Control voltage and/or 3-phase line voltage must
be supplied to the burner panel box through a fused
disconnect.
Figure 38a: Steam Boiler - Safety Valve Hook-up
Figure 38b: Water Boiler - Pressure Relief
Valve Hook-Up
Содержание operating and
Страница 2: ...2 ...
Страница 8: ...8 Section I General Information Figure 1 Dimensional Information ...
Страница 21: ...21 Figure 16 Bare Boiler Assembly ...
Страница 25: ...25 Figure 22 V9A Series Jacket Assembly Boiler Models V903A thru V912A ...
Страница 31: ...31 Figure 26 V9A Series Minimum Piping Parallel Water Boiler ...
Страница 32: ...32 Figure 27 V9A Series Minimum Piping Primary Secondary Water Boiler ...
Страница 33: ...33 Figure 28 V9A Series Minimum Piping Details Bypass with Blend Pump Water Boiler ...
Страница 34: ...34 Figure 29 V9A Series Minimum Piping Primary Secondary with Bypass Water Boiler ...
Страница 35: ...35 Figure 30 Minimum Piping Details Multiple Boiler Application Primary Secondary Piping With Bypass ...
Страница 36: ...36 Figure 31 Minimum Piping Details Multiple Boiler Application Parallel Piping With Blend Pump ...
Страница 37: ...37 Figure 32 Minimum Piping Requirements For Gravity Return V9A Series Steam Boilers ...
Страница 38: ...38 Figure 33 Typical Steam Piping Arrangement for Boilers with Pumped Condensate Return and Boiler Feed Unit ...
Страница 42: ...42 Figure 37b DHW Generation with Tankless Coils Storage Tank and Destratification Pump ...
Страница 43: ...43 Figure 37c DHW Generation with Indirect Water Heater ...
Страница 56: ...56 SECTION VII REPAIR PARTS Continued Figure 39 V9A Series Jacket Assembly Boiler Models V903A thru V912A ...
Страница 58: ...58 Figure 40 Bare Boiler Assembly ...
Страница 62: ...62 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 63: ...63 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 64: ...64 ...