5
II. Unpack Boiler
CAUTION
Do not drop boiler. Do not bump boiler jacket
against floor.
A.
Move boiler to approximate installed position.
B.
Remove all crate fasteners.
C.
Remove outside container with all other inside
protective spacers and bracing. Save two of the
wooden slats from the container sleeve for use in Steps
E and F.
D.
Remove four (4) boiler hold-down fasteners. See
Figure 3.
E.
Tilt the boiler to one side and slide a wooden slat under
the two nylon glides.
F
. Tilt the boiler to the other side and slide another
wooden slat under the two nylon glides.
G
. Slide the boiler forward or backward off the skid using
the two wooden slats as runners.
H
. Move boiler to its permanent location.
CAUTION
Failure to properly pipe boiler may result in
improper operation and damage to boiler or
building.
DO NOT USE AUTOMATIC FEEDER WITH THIS
BOILER.
CAUTION
Oxygen contamination of boiler water will cause
corrosion of iron and steel boiler components, and
can lead to boiler failure. U.S. Boiler's standard
warranty does not cover problems caused by
oxygen contamination of boiler water.
A.
Design and install boiler and system piping
to
prevent oxygen contamination of boiler water.
III. Water Piping and Trim
Figure 3: Removal From Skid
Oxygen contamination sources are system leaks
requiring addition of makeup water, fittings, and
oxygen permeable materials in distribution system.
Eliminate oxygen contamination by repairing system
leaks, repairing fittings, and using nonpermeable
materials in distribution system.
B.
Install Pressure Relief Valve.
See Figure 4 or 5.
Pressure Relief Valve must be installed with spindle in
vertical position. Installation of the relief valve must be
consistent with the ASME Boiler and Pressure Vessel
Code, Section IV.
WARNING
Pressure relief valve discharge piping must be
piped near floor to eliminate potential of severe
burns. Do not pipe in any area where freezing
could occur. Do not install any shut-off valves.
F.
Provide combustion and ventilation air in accordance
with applicable provisions of local building codes, or
National Fuel Gas Code
, ANSI Z223.1, Section 5.3, Air
for Combustion and Ventilation.
WARNING
Adequate combustion and ventilation air must
be provided to assure proper combustion.
This boiler is equipped with a fan which produces an
induced draft through the unit. 100% of combustion air
is pulled in from outdoors and the flue gases are
exhausted to the outdoors through the intake air/vent
system. Refer to Section VI.
G
. Do not install boiler where gasoline or other flammable
vapors or liquids, or sources of hydrocarbons (i.e.
bleaches, cleaners, chemicals, sprays, paint removers,
fabric softeners, etc.) are used or stored.
Содержание Minuteman II
Страница 6: ... Figure 4 Recommended Boiler Piping For Circulator Zoned Heating Systems ...
Страница 7: ... Figure 5 Recommended Water Piping for Zone Valve Zoned Heating Systems ...
Страница 22: ...22 Figure 21 Operating Instructions ...
Страница 25: ...25 Figure 23 Troubleshooting Guide ...
Страница 30: ...30 Figure 27 Burner and Flueway Cleaning ...
Страница 33: ...33 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 34: ...34 ...
Страница 35: ...35 ...
Страница 37: ...37 ...
Страница 38: ...38 ...
Страница 40: ...40 ...
Страница 46: ...46 SERVICE RECORD DATE SERVICE PERFORMED ...