iV. Venting (continued)
Figure 2: Vertical Concentric Vent installation
Figure 2: Completing Horizontal (Wall Terminal installation)
• Install the roof flashing using standard
practice on the roofing system of the
structure.
• If not already done, assemble the venting
system inside the building. The last section
of pipe needs to be on the same center line
as the terminal and within 19-1/4” of the
top edge of the roof flashing.
• Measure distance “H” from the top edge of
the storm collar to the end of the last fitting
as shown in Figure 25.
• Add 1” to distance “H”. Carefully mark
this length on the pipe as shown in Figure
26.
• Cut the
outer pipe only
at the point
marked in Step (e) using aviation shears,
a hacksaw, or an abrasive wheel cutter. Be
careful to cut the pipe square. De-burr the
cut end with a file or emery cloth.
• Place a mark on the plastic inner pipe 3/8”
beyond the end of the outer pipe (Figure
26). Use a fine tooth hacksaw to cut the
plastic pipe and be careful to cut the pipe
square. De-burr the cut edge of the plastic
pipe with a file or emery cloth.
• Make a mark on the terminal section 1”
from the cut end of the outer pipe as shown
in Figure 26.
Содержание Alpine ALP080
Страница 40: ...40 Figure 29 Condensate Trap and Drain Line V Condensate Disposal continued ...
Страница 56: ...56 VIII Electrical continued ...
Страница 57: ...57 VIII Electrical continued Figure 35 Wiring Connections Diagram ...
Страница 58: ...58 Figure 36 Ladder Diagram VIII Electrical continued ...
Страница 64: ...64 Figure 39 Modular Boiler Direct Vent Termination X Modular Installation continued ...
Страница 65: ...65 Figure 40 Modular Boiler Concentric Vent Termination X Modular Installation continued ...
Страница 131: ...131 SERVICE RECORD DATE SERVICE PERFORMED ...