background image

B

2 - 5

Ø8mm

Tools required:

Parts supplied:

Installation position is determined by installer.

1

ST4.8 * 45mm

12x

12x

2x

1x

Ø8mm

2

3

Содержание chaplin r12 chr

Страница 1: ...ection box must be outside the Zone 2 area Zone 1 Zone 2 Zone 0 225cm Zone 1 60cm Zone 1 Zone 2 225cm 60cm Zone 1 Zone 0 Zone 2 60cm 60cm Zone 0 1 Side view bath 2 Top view 3 Side view shower PLEASE NOTE This product can only be used at PN 1MPa 10Kg cm 10Bar It should only be filled with a water mixture containing a rust inhibitor and at a temperature below 100 C or 212 F See table below for insta...

Страница 2: ...B 2 5 Ø8mm Tools required Parts supplied Installation position is determined by installer 1 ST4 8 45mm 12x 12x 2x 1x Ø8mm 2 3 ...

Страница 3: ...ted with the central heating system After installation Use a screwdriver to open the air vent open the inlet valve and let the water rush into the radiator Check all connections for leaks Once water overflows from the air vent there is no air in the tube use a screwdriver to close the air vent Turn on the outlet valve and the radiator is ready for use 4 5 6 ...

Страница 4: ...ot connected to a central heating system then seal the bottom inlet outlet nipples with the blanking plugs Fill the radiator approximately 90 with a water mixture containing a rust inhibitor failure to do this will lead to leaking as the radiator rusts from the inside Filling with more than 90 liquid will lead to leaking as the water mixture expands as it heats up After installation Use a screwdri...

Страница 5: ...re for reference only and should be purchased separately If this radiator used as a dual source connected to central heating system and with a summer electric heating kit fitted While use central heating system power supply must be shut off and release the air in radiator as described in page 3 While use summer electric heating kit only turn off the inlet and outlet valves and make sure the liquid...

Отзывы: