8
08/54070/0 (Issue 6)
7.0 Burco boiler Installation
7.1 Before connecting to the power supply
•
Remove all packaging and plastic coating from the appliance.
•
Check the unit has not been damaged in any way during transportation. Report any damage to the
company who sold you the boiler right away.
•
Check the available power supply corresponds to that shown on the rating label of the appliance,
which must be A.C. (Alternating Current).
•
Ensure the yellow steam cap is removed from the steam vent prior to powering appliance.
•
The location must be frost free.
7.2 Connecting to the water supply
•
Connection from the cold-water supply to the appliance should only be made by the hose supplied.
•
In hard water areas, it is always advisable to fit an inline filtration unit to limit scale build-up. If you
have purchased a Burco boiler that does not have a water filter system included, we recommend
you fit a separate water filter between the boiler and the mains
supply.
•
Always ensure mains water supply is turned off, or localised
isolation valves are closed before attempting to connect boiler
to the mains water supply.
•
The inlet
water connection to the inlet solenoid valve is ¾” BSP,
this should be connected to the mains water supply via an
accessible isolating tap.
•
The blue pipe connects to the grey fitting which can be found underneath the appliance.
•
Firmly push the blue pipe into the small outlet hole on the grey fitting.
•
Ensure grey connection is screwed tight on the appliance and not leaking.
•
Locate the second grey connection fitting. Connect the other end of the blue pipe to this. This
second grey connection fitting is connected to the mains water supply forming a cold-water feed
from the mains water supply to the Burco boiler.
•
Do not use old water hose.
THIS APPLIANCE MUST BE INSTALLED IN LOCATIONS OVERSEEN BY TRAINED PERSONNEL & ON A
FLAT, HORIZONTAL SURFACE.